background image

Extended Gazebo 

Fixing Pack (BEXGAZFP)

Not to Scale

REQUIRED TOOLS : 
(NOT SUPPLIED)

POZI DRIVE SCREWDRIVER

STEP LADDER

TAPE MEASURE

HAMMER

PARTS LIST

Important : 

Assembly of this 

Gazebo requires a 

minimum of three 

adults.

Must pre-drill for 
each screw used.

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

Check all parts prior to assembly

This building is pressure treated to ensure the longevity of 
all timber components and to protect against rot. This may 
leave a colour difference on some parts that will even out as 
the moisture content stabilises. This will not require 
additional treatment.

- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need 
some trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children
- The roof of this building is not a load bearing structure.
- This product must be built on a solid level base.

Technical Help line:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

In line with your statutory rights, please check all parts prior 
to assembly, as assembly of damaged parts may be 
deemed to be acceptance and this may affect the remedies 
you are entitled to. If the product is not constructed in 
accordance with the instructions, or is altered in anyway 
(e.g. painted) the manufacturer cannot be held liable for any 
resulting damage.

flush

E

BAGFINTOP Qty 2

BGLRFB2 Qty 6

(1296mm roof board)

GBSLAT830 Qty 4 

(830mm bench slat)

J

GB

FB

RA

CE 

Qt

4

(73

4m

be

nc

h f

ro

nt 

br

ac

e)

GBSUP Qty 3

(885mm bench support)

EGBLEG440 Qty 4 

(bench leg)

2

1

Place the floor sections 
together to create the base

Position and fix each of the floor capping 
pieces around the edge of the base using 
3 x 30mm nails for each.

Fix the posts to either side of one of the panels and fix them to 
each side using 4 x 70mm screws, screwing through the panel 
framework first. Use 2 x 70mm screws for each side of the 
baluster assembly.

flush

flush

Lip

Silicon Gun and Tube  Qty 1 

70mm screw  Qty 132

45mm screw  Qty 226

30mm Nails  Qty 24

BAGRAF Qty  4

BAGFL1 Qty 1

EGFL1 Qty 1

EGFL2 Qty 1

EGPOSTRH Qty 2

EGSQFL Qty 2

EGRF Qty 2

BAGRF Qty 6

BABGMP Qty  2 BAGPP Qty  3

BAGBAL Qty  2 BAGARCH Qty  3

EGAPRAFC Qty  1

BAGFL2 Qty 1

EGRAFRHC Qty 2EGRAFLHC Qty 2

BAGPOST Qty 4

EGPOSTLH Qty 2

EGMETHAT Qty 2

EGFINBASE Qty 2

119181110NGPT Qty 2

(105x 1110mm board)

BAGFLCAP Qty 6

(64 x 1150mm strip 

angled ends

)

EGFLCAP Qty 2

(64 x 1140mm strip)

119181110PT Qty 4

(119x 1110mm board)

 

GBSLAT1075 Qty 5 

(

1075mm bench slat)

GBSLAT952 Qty 4 

(952mm bench slat)

GBBRACE Qty 4

 

(1075mm bench back brace)

Square Bench Parts

GBSBRACE Qty 16 

(330mm bench side brace)

BENCH ASSEMBLY PARTS

Angled Bench Parts

GBLEG440 Qty 16 

(bench leg)

EGBRACE330 Qty  4

 

(330mm bench side brace)

BGLRFB1 Qty 6 

(1224mm roof board)

EGSLAT1120 Qty 3

(120 x 1120mm bench brace)

EGBRACE1120 Qty 2 

(102 x 1120mm bench brace)

EGBSUP Qty  1

 

(45 x 1120mm bench support)

A

B

C

D

E

F

G

H

 I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

A1

B2

B3

B4

B5

B6

B7

B8

B9

B10

B11

B12

B13

P

H

 I

R

R

Q

Q

J

P

5

3

K

top view

top view

4

 

Make sure that all of the 
panels are secured to 
posts and in line with the 
outside of the base as 
shown

(do not fix to the floor at 

this point)

The R and Q posts must 
be placed opposite 
each other.  

 

flush

Place the arch pieces between the posts 
and so they are in line with the panels. Fix 
the arch in place using 2 x 70 mm screws 
for each using the pre-drilled holes.

Once all of the panels and arches are lined up and 
secure, check that all of the sides are flush with the 
base before securing each panel to the base using 
4 x 70mm screws, screwing down through the 
framing.

Issue 0115

B1

SPIRIT LEVEL

Reviews: