background image

MultiBall Pro - Setup Guide 3.2

Fun With Balls GmbH 

Summary of Contents for MultiBall Pro

Page 1: ...MultiBall Pro Setup Guide 3 2 Fun With Balls GmbH ...

Page 2: ...ro What s In The Box Console Sensor Frame AC Power Cord Installation Guide Dimensions WxHxD 489 x 335 x 14 cm Connectivity Power 110V 220V 230V Internet Ethernet USB Mobile Hotspot Video HDMI use quality cables Audio Internal Sound System ...

Page 3: ... PT VMZ60 Panasonic PT VZ470 Required Resolution WUXGA 1920 x 1200 WXGA 1280 x 800 Required Aspect Ratio 16 10 Use this site to accurately calculate the distance you need for lens and projector https panasonic net cns projector calculator tdc index html Please ask a local projector dealer to help you choose the right projector for your light conditions and the projector distance Recommended play a...

Page 4: ...Dimensions in mm 138 mm 1599 mm 4890 mm 3090 mm 3347 mm ...

Page 5: ...Hardware Holder x9 Sensor x12 Cover x8 Sensor Bolt M4 x40 Cover Bolt M6 x32 Console ...

Page 6: ...Cable Management There are 7 cable outlets to run the HDMI LAN and power cable 138 mm 1599 mm 4890 mm 3090 mm 3347 mm ...

Page 7: ...Recommended Equipment Ladder Laser Level Drill Allen Key Set There are 52 holes with a diameter of 8mm Screws and Dowels for Wall Mounting ...

Page 8: ...Step 1 Open Console Remove the 6 screws and lift up the cover ...

Page 9: ...h other Distance to floor 20mm 2 Mount Left Side and Right Side 3 Verify Left and Right are fully leveled and parallel 4 Mount Top Left and Top Right 5 Mount Console next page Please always make sure all profiles are leveled in order to make the top Frames touch each other with no gap Please select the suitable bolts dowels and washers to attach the frame to the wall according to wall properties 3...

Page 10: ...Secure the Console with 7 bolts Step 2 Mount Console ...

Page 11: ...se Sensor Bolt M4 Step 3 Mount the Sensors Do not over tighten the bolts Sensor Bolt M4 Le ft Si de Bo tt om Ri gh t Si de Bo tt om Bottom Right Bottom Left Top Left Top Right Le ft Si de To p Ri gh t Si de To p Top Middle Right Top Middle Left Bottom Middle Left Bottom Middle Right ...

Page 12: ...ectors with care and tighten them 1 Connect the Sensor Top Left with Top Left Middle and the Sensor Bottom Left with Bottom Left Middle 2 Connect the Sensor Top Right with Top Right Middle and the Sensor Bottom Right with Bottom Right Middle ...

Page 13: ...nd Y Then put down the switch 3 to off Now the light grid is ready to use Multiball setup and connection plan S E 2 TXZS1 TXES1 TXZS2 TXZS3 TXES2 Lvx X Lvx Y TOP Power Power CAN RS232 RXZS3 RXES2 RXZS1 RXZS2 RXES1 Calibration of the light grid Before the first power on after mounting the light bars to their final position put switch 3 the array of tiny switches up on both of the LVX devices Then P...

Page 14: ...Step 5 Cable connections 1 Connect the Console to power outlet and to Internet 2 Connect the projector via HDMI Power LAN HDMI Volume Controle ...

Page 15: ... OUT 1 green LED blinks as you interfere the light bars Center LED blink in a steady interval to show that the unit is alive and working 6 Power off Controller 1 and repeat the same steps with Controller 2 4 starting from step 1 6 and move on to step 7 7 Power on Controller 1 4 Don t change any of the DIP in the MB sensors except DIP 3 During the sensors testing LEDs in the center show the signal ...

Page 16: ...bending the light bar cables If using an electric impact drill make sure not to damage the white surface of the wall Use provided bolts Once covers are on repeat Step 6 Calibrate LVXs Cover Bolt M6 1 Mount the Covers with the sensor holes facing inwards 2 Use Cover Bolt M6 ...

Page 17: ...ure get in touch with us so we can remotely change the settings Using Shift and Corner Correction in your projector align the picture so it perfectly fits into the frame Now it is time to test the system for the first time Everything should run smoothly 1 Disconnect the Console from the power outlet 2 Switch on the projector 3 Connect the Console to the power outlet ...

Page 18: ...tiBall Console Cover Use this step to adjust the volume of the amplifier The volume can also be adjusted in the menu so try to find the best level suitable for you 1 Put back the Cover 2 Use Cover Bolt M6 Cover Bolt M6 ...

Page 19: ...t working always first check the Sensors if they are clean and without any obstruction Take care of the system to avoid any kind of physical damage Vacuum sensors once a week with covers on 1 Do not block the Sensors 2 Do not step on the Sensor Frame ...

Page 20: ...Home Screen 1 Choose between Games and Trainings 2 Start by touching an icon 3 Remote control by Smart Phone Scan QR Code to connect with the MultiBall Smart Phone App ...

Page 21: ...In Game Menu 1 You can open the In Game menu by touching the surface while playing a game 2 Here you can go back to the home screen resume or restart the game and adjust the volume ...

Page 22: ...MultiBall Sportification App App download Apple Android FUN WITH BALLS GmbH Gyßlingstraße 72 80805 München Germany 49 89 323 099 61 www funwithballs com www multi ball com ...

Reviews: