background image

TMS 2015-10-15

Contents

Tests and approvals ............................ 2
Explanation of symbols / foreword ...... 3

Body 

Preparations ...................................... 4
Important measurements...................... 5
Overall installation sequence ............... 6
Assembly ..................................... 7-17

Tiles and cassette

Tiling preparation and assembly ... 17-18
Tiling plan ....................................... 19
Cassette installation ..................... 20-23
Fan installation ................................ 23

Assembly instruction

STUDIO2 tile stoves

Model:

G420 Studio2 White
G421 Studio2 White Special
G422 Studio2 Black
G423 Studio2 Special

Summary of Contents for G421 Studio2 White Special

Page 1: ...asurements 5 Overall installation sequence 6 Assembly 7 17 Tiles and cassette Tiling preparation and assembly 17 18 Tiling plan 19 Cassette installation 20 23 Fan installation 23 Assembly instruction...

Page 2: ...pliance SHRA fired by solid fuel Type serial no Gabriel Kakelugnar 800 serie G820 G861 Model G820 Str msrum G830 Borgholm G840 Ekeby G855 Kung lv G860 Avanti G861 Avanti Intended use Space heating in...

Page 3: ...en Important positions areas for sawing and placing of mortar are marked with a pen Control measurement Shows important measurements during assembly Trowel Shows where the clay mortar is placed Render...

Page 4: ...mm 415 mm min 75 mm 415 mm Base block 680 mm Top connection 2302 mm Rear connection c c 2148 mm Preparations In a corner Against a straight wall In a corner Against a straight wall Combustible wall Co...

Page 5: ...11 13 13 13 12 12 1 17 shows the numbers of all parts see page 6 Control measurement min 75 mm min 75 mm min 75 mm min 50 mm Body In a corner Against a straight wall Base blok 730 mm Distance to wall...

Page 6: ...GABRIEL KERAMIK AB 6 STUDIO2 Start A 7 7 6 5 5 4 3 2 1 17 6 15 14 7 7 7 7 7 7 7 10 10 9 8A 8A 8 8 10 10 10 10 13 13 13 12 12 11 Overall installation sequence STUDIO2...

Page 7: ...ion distance to the wall is kept Level vertically and horizon tally The opening can be directed at right Check the distance to the wall min 75 mm Before starting the assembly make sure that the suppor...

Page 8: ...orrectly Set the outer block 3 with mortar The opening shall face the 45 marking on the floor step 1 Seal with insulation where indicated Set the outer block 4 with mortar level the soot hole with the...

Page 9: ...and horizontally Push the firebox block backwards as much as possible Place the insu lation and pull the firebox block back to lock the indsulation Set the second firebox block 8 on top of the first o...

Page 10: ...aces with a squeezed sponge then brush with a wet radiator brush Set the third firebox block 8A on top of the second one Make sure that no mortar falls between the blocks Level vertically and horizont...

Page 11: ...between the blocks Level vertically and horizontally Cut off the insulation Before continuing above the firebox opening construct a prop to sup port both the outer ring and the firebox top block as s...

Page 12: ...hollow space under the outer ring as indicated Carefully centre and set the outer blocks 7 Make sure that the outer block is one step ahead of each inner block set without mortar during the assembly O...

Page 13: ...oof 11 Level vertically and horizontally Seal with 2 3 mm insulation Set the outer block 7 in mortar Level vertically and horizontally Make sure that no mortar falls between the firebox block and the...

Page 14: ...13 7 7 20 21 22 Assembly Set the outer block 7 with mortar Level vertically and horizontally Set the flame protection block 13 with mortar Level vertically and horizontally Set the outer block 7 with...

Page 15: ...be 2 4 mm below the outer block to allow the inner body to expand Smear a small string of mortar on top of the divider block and the flame protection block Fix the insulation in the mortar string The...

Page 16: ...Set the top lid 14 with mortar Level vertically and horizontally Lay mortar over the damper and the pipeattachment Set the Leca blocks 16 with mortar The inside of the blocks shall be rendered with c...

Page 17: ...he downside of the top lid when it is installed Top connected chimney Set the top lid 17 with mortar and make sure it is in level with the underlying flue gas hole Side connected chimney Turn the lid...

Page 18: ...ox 3mm is recommended The tiles are handmade with tolerance and joints could vary accordingly The overall appearance is important We recommend wooden wedges Start tiling from the bottom and the centre...

Page 19: ...GABRIEL KERAMIK AB STUDIO2 19 Kakelsats Studio2 27 tiles 66cm tiles Granite shelf Decor steel band 50 mm 30 mm Decor steel band Alternative placement Tiling plan...

Page 20: ...lace the enclosed rockwool sheet Cut out a square hole the same size as the hole in the firebox plate as indicated Fit in the cassette so that the steel flanges round the cassette are inside the tiles...

Page 21: ...tion Pass the flexible tube through the cassette bottom and fit it over the connecting flange Fasten the flange plate Mount the damper in the bottom of the cassette do not forget the cotter pins Make...

Page 22: ...at silicon seal Pull out the cassette approx 20 mm and apply silicon just inside the edge around the brass frame then push the cassette back in Even the seal with a wet finger dipping the finger into...

Page 23: ...ar in as it will restrict the inlet convection air flow to the cassette Press the fan carefully into the pre cut hole in the sealing block Note The fan must be moun ted so that air is sucked into the...

Page 24: ...esistant material for long lasting heat radiation Fan controlled direct heat through channels in the hot air cassette for efficient heat circulation Connection for combustion air from the outside The...

Reviews: