background image

info@gcwater.com

20 Opportunity Road, Camdenton, MO 65020

 805-484-1589 • www.GlobalCustomizedWater.com

Easy AB Formulator

- Reverse Osmosis and Remineralization  -

Unit Guide

Summary of Contents for Easy Series

Page 1: ...info gcwater com 20 Opportunity Road Camdenton MO 65020 805 484 1589 www GlobalCustomizedWater com Easy AB Formulator Reverse Osmosis and Remineralization Unit Guide...

Page 2: ...R P O S ES W I T H O U T S P EC I F I C W R I T T E N P E R M I S S I O N F RO M G LO BA L C U STO M I Z E D WAT E R Table of Contents Troubleshooting Guide Routine System Check Guide Production Rate...

Page 3: ...footprint as many Global Reverse Osmosis RO systems a Global standard known to many industries OPERATING PARAMETERS Open Flow Rate 4 5 GPM 17 034 LPM Service Flow Rate 3 GPM 1 4 LPM Storage Tank Capac...

Page 4: ...th the air gap device and back flow device are not supplied as part of the unit These devices are available through your standard plumbing supply house Alternate Bypass If preferred owner installer is...

Page 5: ...R CITY WATER Easy Series AB Formulator from Global shown above FROM MANIFOLD TO ICE MACHINE TO ESPRESSO BREWER WALL WALL Back Flow Device TO Water Heater TO ICE MACHINE SOFT HARD WATER TO ESPRESSO BRE...

Page 6: ...In Casters D AB Formula Caps with Siphon Tubes E 3 8 Blue Tubing F Elbow Connectors G Espresso Connectors 35 ft of 3 8 Tubing provided D J AB Formulator on Metro Rack K Tube Cutter J C E F H I K List...

Page 7: ...e ties under two bars on the metro rack around the manifold and through the zip tie locking device The manifold can be attached on the left or the right of the system Use tube cutter to trim the exces...

Page 8: ...g up the notches 7 Now the system is ready for you to turn on the water to the system Open the city feed to system Double check the A B Formula box connections It will take about 20 30 minutes to fill...

Page 9: ...up System pressure gauge should go up to 60 psi 12 Verify that there are no leaks Filter change is now complete Emergency Bypass In some emergency situations it will be necessary to put the unit into...

Page 10: ...Turn yellow lever on top not front of Easy System from normal mode to test mode Note water should immediately start to flow out of black 1 4 tube 4 Place the black tube into the 500 ml graduated cyli...

Page 11: ...o bypass Emergency situations which require putting the bypass handle into the bypass position turning the bypass handle yellow handle to point towards the word bypass are 1 System pressure gauge read...

Page 12: ...brew coffee during troubleshooting procedures equipment damage may result Y STEP INSTRUCTIONS Step 1 Step 1 Check the system pressure gauge reading If the pressure reading is normal 35 60 psi then the...

Page 13: ...System Service Log Record DATE PRE FILTER POST FILTER MEMBRANE CLEANING OTHER TECH NAME START UP START UP TDS INCOMING DATE BY PPM PSI Easy AB Formulator Unit Guide Page 13...

Page 14: ...s recommendations and applicable state and local codes The Global Customized Water Limited Warranty extends to the original purchaser of the system This warranty covers all parts and factory labor nee...

Page 15: ...accompanies the system Neglect improper maintenance abuse or unapproved modifications may invalidate the Warranty Should your unit develop a defect or otherwise fail to perform in accordance with this...

Reviews: