GEIGER System INline GSI56..e5 

with electronic end stop for the facade technology

Summary of Contents for INline GSI56 e5 Series

Page 1: ...bly and operating instructions Notice originale de montage et d utilisation Instrucciones originales de instalación y funcionamiento Istruzioni originali di installazione e funzionamento EN FR ES IT GEIGER System INline GSI56 e5 with electronic end stop for the facade technology ...

Page 2: ...Thank you very much for your decision and the confidence placed in us Before you put this drive into operation please observe the following safety instructions It serves for the prevention of danger and for the avoidance of personal injury and damage to property The installation and operating instructions contain important information for the installer the specialist electrician and the user Pleas...

Page 3: ...wer supply if opera tions such as for example window cleaning are being carried out in the vicinity f During operation observe the danger zone f Do not use the installation if people or objects are in the danger zone f Urgently shut down damaged installations until repair f Unconditionally shut down the unit during maintenance and cleaning operations f Pinching and shearing points are to be avoide...

Page 4: ...and any other fixed element f The rated speed and the rated torque of the motor must be compatible with the device f The mounting accessories that are used must be designed in accordance with the selected rated torque f Good technical knowledge and good mechanical skills are necessary for the motor installation Incorrect installation can lead to serious injury Electrical work must be carried out b...

Page 5: ...lement and the facade element must be checked on site during installation A centering bore optionally used for double walled profiles may not be larger than 0 3 mm compared to the centering collar Cavity gear The cavity gear must be fixed within the cavity in such a way that the hexagonal rod of the connecting element can be inserted without tension into the hexagonal holding of the gear The screw...

Page 6: ...load of the switching unit must not be exceeded When changing the running direction the switchover must be effected through an off position When changing the running direction the switchover time must be at least 0 5 s With a three phase network please use the same external conductor in order to control the UP and DOWN directions Connecting cables with plug connectors of the Hirschmann Company are...

Page 7: ...be moved by steps 3 and 5 Setting GSI56 e5 I The order of the adjustment process must be strictly adhered to and the adjustment must always be completely implemented all steps 1 Connect the setting switch to the GSI56 e5 and then plug in power supply 2 Press the programming key till the LED flashes 1 flash light break 1 flash light break then release the programming key 3 Setting of the lower end ...

Page 8: ...oltage break down to be tested by a specialist electrician Instead of in the upwards direction motor runs downwards The control leads are interchanged Exchange black brown control leads Motor only runs in one direction Motor in the end position Run motor in the opposite direction Readjust teh end positions if necessary After running several times the motor breaks down and no longer responds The mo...

Page 9: ...5 db A Length2 301 mm 311 mm Diameter 55 mm Weight2 ca 1 50 kg ca 1 70 kg Storage temperature Humidity T 15 C 70 C dry and non condensing place 1 The average sound pressure level data are intended for guidance only The values were determined by GEIGER at a distance of 1 m with a hanging motor at idle speed and averaged over 10 seconds There is no reference to any specific test standard 2 With ange...

Page 10: ...ives 2006 42 EC 2014 30 EU 2014 53 EU 2011 65 EU EU 2015 863 EU 2017 2102 Applied standards DIN EN 60335 1 VDE 0700 1 2012 10 EN 60335 1 2012 DIN EN 60335 1 Ber 1 VDE 0700 1 Ber 1 2014 04 EN 60335 1 2012 AC 2014 EN 60335 1 2012 A11 2014 DIN EN 60335 2 97 VDE 0700 97 2017 05 EN 60335 2 97 2006 A11 2008 A2 2010 A12 2015 DIN EN 62233 VDE 0700 366 2008 11 EN 62233 2008 DIN EN 62233 Ber 1 VDE 0700 366 ...

Page 11: ...ntal protection please contact your local government s recycling or solid waste management department to learn more about the services it provides Waste disposal of electric and electronic equipment Electrical and electronic equipment must be collected and disposed of separately in accordance with EU regulations ...

Page 12: ...n EN EN For technical questions please call our service team at 49 0 7142 938 333 They will be happy to assist you Gerhard Geiger GmbH Co KG Schleifmühle 6 D 74321 Bietigheim Bissingen T 49 0 7142 9380 F 49 0 7142 938 230 info geiger de www geiger de ...