Step 1: Disassemble the interlock. Place the bottom plate (holes only) Below the top right breaker and mark
holes. Plate is parallel to top right breaker.
Step 2: Turn off main breaker and remove panel cover.
Step 3: Drill holes as marked on panel cover with supplied 3/16 drill bit and remove all burs from drilling cover.
Step 4: Insert screws from rear of cover, install bottom plate, and install top plate (slotted) with retaining nuts.
Ensure proper movement.
Model
GE-200B
Main Breaker
200 amp Vertical throw with main on bottom
Generator Breaker
Bottom right side 2 positions
WARNING
Only qualified personnel should be working on the panel box
An amateur should
NEVER
open the panel box
Please follow all rules and regulations of the National Electric Code