background image

These instructions cover the installation and
operation of the repeat indicator panel.

Installation

a.

Open the outer cover

b.

Insert the external cable into the backbox
assembly at the required entry point.

c.

Mark the fixing points and secure the backbox
to the wall.

d.

Connect the cable to terminals.

e.

Refit the front cover and flap.

All outstanding work is carried out during the
commissioning of the system.

4188-760 issue 4_01-10_Rept ind.

1

Installation and Operation

Repeat indicator panel

(COMPACT-RPT / SENADV-IND)

PANEL

MASTER CONTROL BOARD

REPEAT RS485

24V

B

A

0V

P15

Terminals P15 is PORT 0 of

Master Control Board

(Card 0)

The factory default setting of PORT 0

is set for

to allow

repeat indicator panel connection

Repeat mode

REPEAT INDICATOR PANEL 1

-

+

a

b

RS485

earth

PANEL

MASTER CONTROL
BOARD

Terminals P15 is PORT 0 of

Master Control Board

(Card 0)

The factory default

setting of PORT 0 is

to allow connection to
repeat indicator panel

Repeat mode

REPEAT RS485

24V

B

A

0V

P15

REPEAT INDICATOR PANEL 1

a

b

RS485

earth

REPEAT INDICATOR PANEL 4

-

+

24V

a

b

RS485

earth

UP TO 4 REPEAT INDICATOR
PANELS MAXIMUM

POWER
SUPPLY UNIT

+

-

If there is only
one repeat indicator
panel connected
then use the 24V
supply on the
Master control board.

-

+

24V

24V

24V

S24

RESET

S24

REPEAT INDICATOR PANEL 3

RESET

REPEAT INDICATOR PANEL 2

ON

RESET

REPEAT INDICATOR PANEL 1

ON

RESET

REPEAT INDICATOR PANEL 4

ON

1 2 3 4 5 6 7 8

ON

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

S24

J2

J3

J4

J6

J5

J7

J2

J3

J4

J6

J5

J7

J2

J3

J4

J6

J5

J7

J2

J3

J4

J6

J5

J7

END STATION LINK SETTING

ON

S24

ON

ON

ON

9600 baud

4800 baud

2400 baud

1200 baud

1 2

SWITCH
POSITIONS

S24

1 & 2

1

2

3

4

5

6

7

8

9

0

+

REL

-

24V

a

b

RS485

ON

1 2 3 4 5 6 7 8

J6

J5

J7

Back cable entry point

Thinned sections
on sides of enclosure for
cable entry

4 enclosure fixing points

Reviews: