These instructions cover the installation and
operation of the repeat indicator panel.
Installation
a.
Open the outer cover
b.
Insert the external cable into the backbox
assembly at the required entry point.
c.
Mark the fixing points and secure the backbox
to the wall.
d.
Connect the cable to terminals.
e.
Refit the front cover and flap.
All outstanding work is carried out during the
commissioning of the system.
4188-760 issue 4_01-10_Rept ind.
1
Installation and Operation
Repeat indicator panel
(COMPACT-RPT / SENADV-IND)
PANEL
MASTER CONTROL BOARD
REPEAT RS485
24V
B
A
0V
P15
Terminals P15 is PORT 0 of
Master Control Board
(Card 0)
The factory default setting of PORT 0
is set for
to allow
repeat indicator panel connection
Repeat mode
REPEAT INDICATOR PANEL 1
-
+
a
b
RS485
earth
PANEL
MASTER CONTROL
BOARD
Terminals P15 is PORT 0 of
Master Control Board
(Card 0)
The factory default
setting of PORT 0 is
to allow connection to
repeat indicator panel
Repeat mode
REPEAT RS485
24V
B
A
0V
P15
REPEAT INDICATOR PANEL 1
a
b
RS485
earth
REPEAT INDICATOR PANEL 4
-
+
24V
a
b
RS485
earth
UP TO 4 REPEAT INDICATOR
PANELS MAXIMUM
POWER
SUPPLY UNIT
+
-
If there is only
one repeat indicator
panel connected
then use the 24V
supply on the
Master control board.
-
+
24V
24V
24V
S24
RESET
S24
REPEAT INDICATOR PANEL 3
RESET
REPEAT INDICATOR PANEL 2
ON
RESET
REPEAT INDICATOR PANEL 1
ON
RESET
REPEAT INDICATOR PANEL 4
ON
1 2 3 4 5 6 7 8
ON
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
S24
J2
J3
J4
J6
J5
J7
J2
J3
J4
J6
J5
J7
J2
J3
J4
J6
J5
J7
J2
J3
J4
J6
J5
J7
END STATION LINK SETTING
ON
S24
ON
ON
ON
9600 baud
4800 baud
2400 baud
1200 baud
1 2
SWITCH
POSITIONS
S24
1 & 2
1
2
3
4
5
6
7
8
9
0
+
REL
-
24V
a
b
RS485
ON
1 2 3 4 5 6 7 8
J6
J5
J7
Back cable entry point
Thinned sections
on sides of enclosure for
cable entry
4 enclosure fixing points