background image

ECdrive H

EN   Pre-installation instructions

190486-01

Summary of Contents for ECdrive H

Page 1: ...ECdrive H EN Pre installation instructions 190486 01...

Page 2: ...Diagrams 6 4 2 Tools and aids 6 4 3 Torques 6 4 4 Components and assembly groups 7 4 5 Bill of material VP Kit ECdrive H 7 5 Pre mounting 8 5 1 Machining the track and cover 8 5 2 Preparing the track...

Page 3: ...age to understand or optimise the operation sequences means additional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the...

Page 4: ...pair work must be performed by properly trained personnel authorised by GEZE The country specific laws and regulations are to be observed during safety related tests If unauthorised changes are made t...

Page 5: ...d crushing impact drawing in or shearing spots Risk of injury due to sharp edges on the drive and door leaf Risk of injury during installation through freely moving parts 2 4 Environmentally conscious...

Page 6: ...17 2 0229 Component drawing Leaf spring for cover ECdrive H The diagrams are subject to change without notice Use only the most recent version 4 2 Tools and aids Tool Closer size Tape measure Marking...

Page 7: ...ll of material VP Kit ECdrive H 1 Side plate 2 Transformer ground 3 Transformer 4 Transformer cable 5 Deflection pulley 6 Cable guide 7 Tooth belt 8 Control unit 9 Rechargeable battery 10 Motor gear u...

Page 8: ...over X X Check profiles for damage X X Cut the track and cover to the required length see machining drawings Chapter 4 1 X X Install the line feed 1 and drill holes 2 according to the drawing X X Clea...

Page 9: ...tion of the stop buffers 1 is specified during door leaf installation 5 4 Installing the drive components The exact positioning of the components is given on the drive drawings Illustrated 1 leaf W 70...

Page 10: ...there are no cables near the moving parts Cable guide spacing approx 200 mm X X Fix the cable guide 1 on the track 5 6 Connecting motor gear unit and control unit 3 1 2 X X Route the rotary encoder ca...

Page 11: ...e wire transformer cable 1 to length X X Strip both ends and attach insulated wire end ferrules X X Attach the two plugs 3 to the control unit 2 X X Plug the connector 3 into the control unit 2 3 1 2...

Page 12: ...ing the transformer ground WARNING The track is not earthed if there is a poor connection between earthing jumper 2 and track X X Check whether the setscrews of the earthing jumper 2 penetrate the ano...

Page 13: ...there are no blank points available for the device safety test X X Screw the cable shoe of the cover earthing cable 1 using a countersunk screw 4 serrated washer 3 and hexagon nut 2 X X Connect the e...

Page 14: ...y due to impact and crushing When the rechargeable battery cable 1 is plugged in the pulley on the motor gear unit may move suddenly X X Do not reach into the area of moving parts X X Check whether th...

Page 15: ...s cable and the metal part contacted with the probe is tested in each case Use the probe to contact at least the following test points Transformer metal bracket PE connection on the secondary side of...

Page 16: ...nce fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office...

Reviews: