background image

FUSION

TM

 LITTER BIN

1

Operator Instruction Leaflet

To Remove and Replace Dome Top (Sack Retention or Solid Liner Model)

To Remove and Replace Solid Liner 

IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE

1.

4.

7.

8.

5.

6.

2.

3.

Peg

Slot

Peg

Slot

Peg

Slot

Peg

Slot

Peg

Slot

Peg

Slot

Peg

Slot

Peg

Slot

Insert key and twist 

clockwise.

Push the lock back in to 

secure the Dome Top 

to the bin.

Remove Dome Top,  if used, 

and use handles on Liner Rim 

to lift Liner in and out of the bin.

Twist Dome Top 

anticlockwise.

Lift Dome Top from the 

bin.

Replace the Dome Top 

into the recess at the 

top of the bin.

Twist anitclockwise until 

the slots drop over the 

pegs on the bin rim, 

locating the Top.

When the Top is fitted 

over the pegs, Twist 

clockwise to secure.

Summary of Contents for FUSION LITTER BIN

Page 1: ...lot Peg Slot Peg Slot Peg Slot Insert key and twist clockwise Push the lock back in to secure the Dome Top to the bin Remove Dome Top if used and use handles on Liner Rim to lift Liner in and out of the bin Twist Dome Top anticlockwise Lift Dome Top from the bin Replace the Dome Top into the recess at the top of the bin Twist anitclockwise until the slots drop over the pegs on the bin rim locating...

Page 2: ...cking position Push the Lock back into the barrel to secure the Locking bar in position and Liner in the bin Lift the Liner from the bin using the handles on the Liner rim Upon replacement of the Liner pull the Locking bar across from its resting position Lift the locking bar upwards from its seated position the location slot will guide its movement Push the Locking bar across into its unlocked re...

Page 3: ...op if used by following instructions 1 3 Push the sack bands back down to secure the sack in position Attach pedastal to bin using the M10 x 30 bolts and Nyloc nuts provided Note See page 4 for ground fixing details Pull the sack bands upwards Pull the sack up from within the bin and wrap over the sack bands Peg Slot Peg Slot ...

Page 4: ...and drill the marked holes with a 12mm masonry drill bit to a minimum depth of 80mm or through the paving slab 5 Ensure the holes are free from any obstructions and debris caused by drilling 6 Reposition bin so that the holes in the bin and the drilled holes are aligned then insert all four Ground Bolts 7 Ensure the washer is in positon at the top of the Bolt and tap down all fixings using a hamme...

Reviews: