background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Contents: 

  

1.  General notes

 

 

 

Page 6

 

1.1  Safety   

2.  Technical data

 

 

 

Page 6

 

3.  Installation requirements

   

Page 7

 

3.1  Choice of location: 
3.2  Excavation dimensions: 

4.   Installation

   

 

 

Page 8

 

4.1  Connecting the inlet and  

venting pipes 

4.2  Installation of the drainage blocks

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

The points described in these 
instructions must be followed 
correctly. If not correctly 
observed,  any  right  to  claim 
on the guarantee may be 
refused.  For  all  additional 
GARANTIA articles 
purchased  there  are  separate 
installation instructions 
enclosed in the 
transportation packing.  
 
Any 

missing 

instructions 

must  be  requested  directly 
from us. 
 
A  complete  check  of  the  tank 
for  possible  damage  must  be 
carried out before the 
installation  in  the  excavation 
begins. 
 
The installation must be  
carried  out  by  a  professional 
firm. 

 

Graf drainage block 300 lorry 
Order Nr: 360014 

Graf drainage block 300 lorry 
inspect 
Order Nr: 360015 

Graf drainage block 300 car 
Order Nr: 360016 

Graf drainage block 300 car 
inspect 
Order Nr: 360017 

Accessories: 
Connection elements (10 pieces) 
Order Nr: 369012  

Geo-textile 200 

(Per m., roll wid. 5m)

 

Order Nr: 369014 

Installation instructions and maintenance for the 

GRAF drainage block 300

 

De

u

ts

c

h

 

E

n

g

li

s

c

h

 

Page 5 of 8 

Summary of Contents for 300

Page 1: ...ctions enclosed in the transportation packing Any missing instructions must be requested directly from us A complete check of the tank for possible damage must be carried out before the installation in the excavation begins The installation must be carried out by a professional firm Graf drainage block 300 lorry Order Nr 360014 Graf drainage block 300 lorry inspect Order Nr 360015 Graf drainage bl...

Page 2: ...uct a complete system The use of other manufacturers accessories can impair the function of the system and liability for any resulting damages will no longer be covered under the guarantee Volume Gross 300 Litre Net 285 Litre Length 1200 mm Width 600 mm Height 420 mm Connections 12 x DN 150 6 x D 125 6 x DN 100 Weight Rain Bloc car 15 5 kg Rain Bloc car inspect 16 5 kg Rain Bloc lorry 17 5 kg Rain...

Page 3: ...uration Max 3 5 t m Max 5 0 t m max Earth covering 2000 mm 2750 mm max Installation depth 3500 mm 5000 mm Light traffic and without traffic loads max Number of layers 7 layers 10 layers min Earth covering 250 mm 250 mm max Earth covering 2750 mm max Installation depth 5000 mm HGV 12 max Number of layers 10 layers min Earth covering 500 mm max Earth covering 2500 mm max Installation depth 5000 mm S...

Page 4: ...sure a stable interconnection Before filling the module must be completely wrapped in the Geo textile and special attention must be paid to ensure that all the ends and edges of each fleece roll overlap by at least 30 50 cm To conclude the installation the excavation is evenly backfilled and compacted The terrain of the ground surface and substructure should be the expected load to be prepared If ...