GBLI6532 Battery System Quick Installation Guidance  

Summary of Contents for GBLI6532

Page 1: ...GBLI6532 Battery System Quick Installation Guidance ...

Page 2: ...mpliance with storage transportation installation and usage requirements specified in Quick Guidance and Manual are not coved by Warranty CAUTION 1 Product Overview LED 1 LED 2 LED 4 LED 5 LED 3 2 1 3 4 5 6 7 8 1 475 765 150 148 745 No label Name No label Name 1 POWER Power button 5 Link out Parallel Network Output 2 Positive terminal 6 Grounding terminal 3 _ Nagative terminal 7 PCS Network port t...

Page 3: ...or use battery near explosive or inflammable substances Use battery in well ventilated environment with temperature ranging from 10 to 50 For outdoor installation build sun rain shade to avoid direct sunlight and rain exposure Do not place battery upside down nor alongside as the above picture shown Maintain a minimum level of dust and dirt in the environment CAUTION 2 θ 5 θ 5 Wall Wall Wall Groun...

Page 4: ... drilling spots Note 1 Keep a minimal distance of 320mm between wall and bracket a maximum distance of 765mm between bracket and ground Leave a minimum clearance of 133mm before the front surface of battery 2 The weight capacity of wall should exceed 4 times weight of batteries 3 At least two persons conduct the installation One person places the bracket on wall and ensure the gradienter horizonta...

Page 5: ...urface of battery Step 2 Drill in the spots for at least 60mm Clean the soil and drive expansion tube into hole 4 Drive M8 screw through notch of latch into wall Step 3 Fix battery on bracket from the top down Note In order to guarantee a stable connect between battery and bracket please visually check if the two upper joints are fixed Try to move the lower part of battery away from wall The conne...

Page 6: ...6 GND ISO 7 GND ISO 8 WKP OUT 3 1 Connect Cables for Single Battery 1 Measure battery voltage with a multi meter and ensure the voltage output is 0V under power off mode 2 Fasten grounding terminal and grounding cable with M6 screw recommending a torque of 5N m 3 Insert power cables into DC Breaker and battery terminals orange positive cable and black negative cable Plug one end of Network Cable A...

Page 7: ...ERTER 300 d 500 300 d 500 6 2 Fasten ground terminal and grounding cable with M6 screw for two batteries 3 Insert power cables Plug one end of power cables into DC breaker Measure the positive and negative terminal blocks of each battery with a multi meter and ensure the voltage outputs under off mode are all 0V After that plug the other end of power cables into battery terminals to PCS Positive T...

Page 8: ...hnical knowledge is involved in the electrification process and electricians must go through technical training and obtain certificates in compliance with local law and regulations Please stand on dry insulating objects and do not wear metal objects such as watches necklaces and rings during operation Insulating tools should be used Do not contact with two charged positions with potential differen...

Page 9: ...us PCS HMI screen indicates normal PV or mains supply input Single Battery Power on battery by pressing POWER button Power on battery by Activating PCS Procedures Acceptation criteria Procedures Acceptation criteria 1 Close the breaker from battery to converter Breaker in ON status 1 Close the breaker from battery to converter Breaker in ON status 2 Press POWER button for two seconds and observe t...

Page 10: ...Address No 28 Guangming Road Shiyan Street Bao an District Shenzhen P R China Press the POWER button of any battery for two seconds Five LED lights will flicker for three times and battery turns off Battery will turn off 25 minutes after Network Cable A connection between PCS and PACK fails 5 2 Power off Battery ...