background image

Download
Manual

Installation
                     
                         Operation Manual

   

                       

&

GR-UM-200-A-00

GR-UM-200-A-00

SPH3000TL BL-US

SPH3600TL BL-US

SPH4000TL BL-US

SPH4600TL BL-US

SPH5000TL BL-US

SPH6000TL BL-US

Summary of Contents for SPH3000TL BL-US

Page 1: ...Download Manual Installation Operation Manual GR UM 200 A 00 GR UM 200 A 00 SPH3000TL BL US SPH3600TL BL US SPH4000TL BL US SPH4600TL BL US SPH5000TL BL US SPH6000TL BL US ...

Page 2: ...fety Measure Symbols introduction on the SPH inverter 1 1 Preface 1 2 Target Group 1 3 Product Description 1 4 Safety Instructions 3 Product Description 4 Unpacking 5 Installation 5 1 Basic installation requirements 5 2 5 3 5 4 Installation requires tools and RJ 45 terminal sequence of the LAN line Installation Instructions SPH System electrical connection ...

Page 3: ...e SPH inverter 11 3 Storing SPH inverter 11 4 Disposing of the SPH inverter 8 Attention of the installation environment maintenance and cleaning 15 Contact 9 Fault removal 11 Decommissioning 10 Manufacturer Warranty 12 Product specification 7 1 Start up the SPH system 7 2 Disconnect the SPH system 12 1 SPH series energy storage machine product specification 12 2 Torque 12 3 Appendix Annex Technica...

Page 4: ...ompatibility list which provide by manufacturer but used for lead acid battery or used lead acid battery for lithium battery model it will be dangerous Installer can install energy storage machine of SPHTL BL US Series rapidly and troubleshooting build communication system through read this manual carefully 1 Brief Introduction 1 2 Target Group 1 3 Product Description SPHTL BL US Series is used to...

Page 5: ...V switch Otherwise it will be dangerous as high terminal voltage of modules in the sunshine 2 Safety 2 1 Safety Measure Risk of high voltage Relevant operation for professional personnel Please notice children disabled laypeople do not close Supervise and make sure children don t play near the installation position of energy storage machine Risk of burns on the parts shell of SPH inverter During t...

Page 6: ... 3 3 1 Growatt SPH series inverter Label contains the following information for example SPH6000TL BL US shows as below Model A mm In B mm In C mm In weight kg lb Growatt SPH 565 22 24 669 26 34 179 7 05 32 73 85 3 3 Size and weight 3 4 The advantage of the unit of SPH Features below All in one design Can improve self consumption back up and also Pinch the valley Smart management work mode can be s...

Page 7: ... between SPH and battery should not be more than 1 5m F The ambient temperature should be 25 60 13 F 140 F G SPH can be installed in vertical or lean back on plane please refer to the below H Installation position shall not prevent access to the disconnection means I In order to ensure machine can run normally and easy to operate please pay attention to provide adequate space for SPH pleases refer...

Page 8: ...d be installed in the live line LAN line RJ45 sequence as follow PIN 1 2 3 4 5 6 7 8 Color White orange Orange White green Blue White blue Green White brown Brown 5 3 1 Attention Layout length of sensors consider Attention Battery installation requirement As the system refer to battery use we must make sure ventilation of the service environment and temperature control in order to prevent the dang...

Page 9: ...SE and auto transformer Can be purchased from Manufacturer Grid switch Recommended a 2 pole AC circuit breaker with a rated voltage greater than or equal to 240 V AC and a rated current of 40A Purchased by the customer EPS switch Recommended a 2 pole AC circuit breaker with a rated voltage greater than or equal to 240 V AC and a rated current of 25A Purchased by the customer Battery switch Recomme...

Page 10: ...oint is showed as follow and the minimum grounding cable wire is AWG10 1 Nut 2 Fitting 3 Conduit M6 5 4 Grounding connection Cable Type Conductor Cross sectional Area Range Source Energy meter signal cable Battery signal cable Net cable complies with UL2919 CM CMG NEC type or CMH CSA type NA Can be purchased from Manufacturer Purchased by the battery supplier or customer PV input power cable 1 PV ...

Page 11: ...cable to positive pole of PV input terminal block connect negative pole of connection cable to negative pole of PV input terminal block please pay attention to PV input voltage and current within permission Step 6 Secure the fitting to the conduit Step 7 Checks that the cables are connected correctly and securely Then take appropriate measures to ensure that the pipe conduit and fittings are secur...

Page 12: ...cured reliably and seal the cable holes EPS output terminal connection steps as follow Step 1 Remove the locking nut and waterproofing bolt Step 2 Route the EPS output power cable through the conduit and then the fitting of the pipe Step 3 Connect the EPS output power cable to the terminal block Step 4 Secure the fitting to the conduit Step 5 Check that the cables are connected correctly and secur...

Page 13: ...onnect with AC grid and float EPS OUTPUT 2 If you have no battery now you can also float BAT terminal and this hybrid inverter will only work like a PV inverter 3 If you want to use both on gird power and uninterrupted power please refer to chart connect with AC grid and EPS OUTPUT like the chart show 4 On grid terminal and off grid terminal can t directly connect together 5 Off Grid terminal can ...

Page 14: ...If no other cables need to be installed Secure the fitting to the conduit Installation steps as follow Step 1 Remove the locking nut and waterproofing bolt Step 2 Route the battery power cable through the conduit and then the fitting of the pipe Step 3 Connect the battery power cable to the terminal block Step 4 Secure the fitting to the conduit Step 5 Check that the cables are connected correctly...

Page 15: ... you can see an arrow labeled on it indicating the direction of current Put the live wire among the under detection wires onto the current transformer in the USA there are two live wires need to add current sensor do not add the current sensor in the same live wire After latching the current transformer the installation has been finished Notice 1 The direction from K to L of the arrow on the curre...

Page 16: ...When customer using lead acid battery the temperature probe of the lead acid battery is used to detect the ambient temperature of the lead acid battery the battery temperature cable of the SPH side connection steps are as follows Step 1 Remove the locking nut and waterproofing bolt Step 2 Route the NTC cable through the conduit and then the fitting of the pipe Step 3 Insert the RJ45 plug of the ne...

Page 17: ...ly set one period but if you use website settings you can set up to three periods of the priority mode refer to 6 3 4 1 Load first Load first is the default mode when it s working in this mode PV energy would offer to load and battery prior when PV is Insufficient battery would discharge when PV is sufficient for load the excess energy would feed to battery If there is no battery or battery is ful...

Page 18: ...PH inverter would log out automatically when the updating finish and turn to other mode 6 2 4 Checking mode Before SPH work in normal mode it will go to self check mode If all are ok system will go to normal mode otherwise it will go to fault mode 6 2 5 Standby mode If the system hasn t faults while the condition is not qualified SPH would stay at standby mode 6 2 6 Shutdown mode If customer need ...

Page 19: ...state The B line s information as follow In normal it will turn on page automatically when pushing the button UP the order of the paging information as follow WorkMode Input Output Para WorkMode Lead acid Vb xx xV Lithium Vb Cb xx xV xxx WorkMode Vpv xxxV xxxV WorkMode Ppv xxxxW xxxxW PV1 PV2 voltage Battery information WorkMode Grid xxxV xxHz WorkMode EPS xxxV xxHz WorkMode Po xxxxW xxxxVA Grid i...

Page 20: ...s 240V lead acid cell charging voltage default is 58V discharge low voltage default is 48V and lead acid constant current default is 75A 2 Under the Off gird mode you can see the setup options below after pressing Enter for 1S In the Off grid you can set EPS including enable or disable default is enable AC voltage default is 240V and frequency default site 60HZ WorkMode Off grid WorkMode WorkMode ...

Page 21: ...is 1 Range from 10 to 100 and the accuracy is 10 Press down key to the next item Press down key to the next item choose OK to the next item choose OK to the next item Lead acid Press enter key to make sure MODE Change WorkMode Cable CT WorkMode Meter Lithium WorkMode Press enter key to make sure Battery Type WorkMode Press down key to the next item Sensor WorkMode Exportlimit is used for users to ...

Page 22: ...set you can see the setup options below after pressing Enter Default set is resume to default setting please don t use it unless it s necessary 6 4 Communication 6 4 1 Use of USB A port USB A port is mainly for firmware update and monitor Through USB connection we can quickly update the software of machine or using shine WiFi X RF or GPRS also ok to monitor the system You can see USB A as below De...

Page 23: ...ws 6 4 3 The SPH s monitoring The SPH provide USB interface Users can through the following communication solution to monitor the SPH For example Using Wi Fi X monitor SPH as follow Note This kind of monitoring can only be used by the monitor of Growatt s Shineserver shine phone provided by the company Through RS232 interface connect to Wi Fi S shinelink GPRS use computer terminal or mobile phone ...

Page 24: ...lay tools or metal parts on top of batteries Disconnect charging source prior to connecting or disconnecting battery terminals Determine if battery is inadvertently grounded If inadvertently grounded remove source from ground Contact with any part of a grounded battery can result in electrical shock The likelihood of such shock can be reduced if such grounds are removed during installation and mai...

Page 25: ...the grid voltage Check the frequency is in the range of specification or not Restart inverter Please contact Growatt service center if restart can t solve the problem BMS COM Fault Communication fault Check the lithium Battery is open or not Check the connection of lithium Battery and inverter is good or not Battery reversed Battery terminals reversed Check the positive and negative of battery is ...

Page 26: ...000 TL BL US SPH4600 TL BL US SPH5000 TL BL US SPH6000 TL BL US Limited Product Warranty Applicable under normal application installation use and service conditions manufacturer warrants the above listed products to be free from defects and or failure specified for a period not exceeding five 5 years from the date of sale as shown in the Proof of Purchase to the Original purchaser The warranties d...

Page 27: ...allation of the modules shall also be expressly excluded as are all other related logistical and process costs incurred by all parties in relation to this warranty claim 11 1 Dismantling the energy storage Decommissioning 11 1 Disconnect the storage machine such as mentioned in section 7 2 Disconnect the upper cable of SPH inverter 3 Unscrew all the connecting cable 4 Unscrew the radiator and wall...

Page 28: ...3680VA 3680VA Nominal AC voltage 240Vac Nominal AC frequency 60Hz Max output current 16 THDv 2 Switch time 1s Specifications Model SPH3000 TL BL US SPH3600 TL BL US SPH4000 TL BL US Battery data DC Battery voltage range 42 59V Recommended battery voltage 48V Max charging discharging current 75A Continuous charging discharging power 3000W 3680W 3680W Max charging discharge power 4000W 10s Type of b...

Page 29: ...L US SPH6000 TL BL US Input data DC Max recommended PV power for module STC 8000 Max DC voltage 550 Start voltage 150 Nominal voltage 370 MPP voltage range 150V 550V No of MPP trackers 2 No of PV strings per MPP trackers 1 Max input current per MPP trackers 13 Max short circuit current per MPP trackers 15 Output data AC AC nominal power 4600W 4999W 6000W 240V 520 0W 208V Max AC apparent 4600VA 499...

Page 30: ...YES Grid monitoring YES Anti islanding protection YES Residual current monitoring unit YES General data Dimensions W H D in mm 669 565 179 26 34 22 24 7 05 Weight 33 5kg 73 85lb Operating temperature range 25 C 60 C 13 F 140 F with Noise emission typical 25dB A Altitude 2000m 6561ft Specifications Model SPH4600 TL BL US SPH5000 TL BL US SPH6000 TL BL US Self Consumption 12 W 4 Topology Transformer...

Page 31: ... Certificate 13 Contact 14 SPH series inverter apply within the scope of the world so the inverter have to satisfy different countries and regions of different safety standards Model Certificate SPH3000TL BL US SPH3600TL BL US SPH4000TL BL US SPH4600TL BL US SPH5000TL BL US SPH6000TL BL US UL1741 2018 IEEE1547 CSA C22 2 Rule 21 Rule 14 If you have technical problems about our products contact the ...

Page 32: ...hreshold trip time 21s Low voltage 2 Lv2 Max threshold voltage 70 Vnom Max threshold trip time 11s Low voltage 3 Lv3 Max threshold voltage 50 Vnom Max threshold trip time 1 5s 1 2 Ride Through High Frequency and Low Frequency Maximum Maximum Rule 21 Parameter name Required settings in accordance with UL 1741 SA High Frequency 2 HF2 High Frequency 1 HF1 Low Frequency 1 LF1 Low Frequency 2 LF2 Max t...

Page 33: ...me When the grid frequency exceeds 60 dbof the output active power PM varies with the grid frequency When the grid frequency returns below 60 dbof the output current rise rate limit of the output active power is RR Default Setting 60 036Hz 5 60 017Hz 61Hz 2 7 50ms 3s Ranged of Adjustability Parameter Overfrequency point 60 dbof Hz Kof Pn 60 Kof Hz Response time Frequency measurement accuracy MSAHz...

Page 34: ...n off and modify parameter settings The inverter have the following functions Remote receive message from the utility or its agent to start or shutdown inverter Remote receive message form the utility or its agent to complete parameter setting enable or disable the above function in accordance to Rule21 The remote control software ShineBus can be obtained from the equipment provider Instructions 1...

Page 35: ... Default Tolerance of Measurement Voltage Volts 1 Urated Current Amps 1 Irated Power Watts 1 Prated Reactive Power VA 1 Srated Power Factor Displacement power factor 0 01 Frequency Hz 0 05 Response Time Seconds 1 Time accuracy Total time 0 1 63 ...

Reviews: