background image

1

GROWSPAN

 GOTHIC PREMIUM HIGH TUNNELS

Revision date: 01.08.21

Ground Level

Photo may show a different but similar model. These instructions include information for buildings equipped with either 

drop-down side panels or roll-up side panels. Verify that you are completing the correct steps for your building. The cover 

installation steps for buildings with a film cover or a 5.2 oz fabric cover are the same. 

STK#  

DIMENSIONS

108179H 

20' W x 14' H x 24 L

108180H 

20' W x 14' H x 36' L

108181H 

20' W x 14' H x 48' L

108182H 

20' W x 14' H x 60' L

108183H 

20' W x 14' H x 72' L

108184H 

20' W x 14' H x 96' L 

©2021

All Rights Reserved. Reproduction 

is prohibited without permission.

GrowSpan

  Gothic Premium High Tunnels 

(All H Models)

Summary of Contents for Gothic Premium 108179H

Page 1: ...you are completing the correct steps for your building The cover installation steps for buildings with a film cover or a 5 2 oz fabric cover are the same STK DIMENSIONS 108179H 20 W x 14 H x 24 L 1081...

Page 2: ...mage LOCATION Choosing the proper location is an important step before you begin to assemble the structure Follow these requirements Never erect the structure under power lines Identify whether underg...

Page 3: ...ts to the main frame install the panel and attach the anti billow ropes 14 Read the care and maintenance information at the end of these instructions 15 Complete and return all warranty information as...

Page 4: ...Customer Supplied End Framing Installation In areas where loose or sandy soil conditions are found or where deep frost is common setting the customer supplied end frame posts in concrete is recommend...

Page 5: ...with the next A customer supplied two piece ribbon board is required for the drop down panel Fasteners are included Customer supplies the materials for the ribbon board Minimum board requirements are...

Page 6: ...oose in sandy soil when concrete is not used Minimum board requirements are shown in the diagrams below If a ribbon board is not used attach the 104211 double u channel directly to the rafters along t...

Page 7: ...bulk material used to cover the open areas of the end frame and door frame See End Panel Location diagram in the Quick Start section of this guide DD084HxxxCN52 This number identifies the panels used...

Page 8: ...ons describe the installation of the optional ridge vent kit Additional purchase required The ridge vent kit is designed for use with the HF model 5 2 oz cover only If you have the C model or did not...

Page 9: ...the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if needed before driving...

Page 10: ...and arrange on a level surface 2 Slide one 1 end purlin clamp 102856 onto the peak rafter pipe and one clamp onto each leg pipe Position end clamps on the rafter pipes as shown 3 Insert the swaged end...

Page 11: ...t Depending on the frame size a lift and additional assistants may be needed Consult Quick Start section for details Rafter shown differs in design ATTENTION Stand the rafter so the end clamp nuts and...

Page 12: ...in position DO NOT USE THE REMAINING END RAFTER ATTENTION Do not add a band clamp A band clamp is only added to the end rafters and the first interior rafters at either end of the frame 13 Secure the...

Page 13: ...ipes 3 Using the diagram below and the Side Profile diagram in the Quick Start section as guides position a purlin diagonally and secure to each rafter it crosses using pipe straps and Tek screws NOTE...

Page 14: ...red for drop down sides Position strut so it will not interfere with the installation of the baseboard Ground Level 2 Attach one end of the strut to the band clamp as shown in the diagram below Strut...

Page 15: ...the boards Customer supplies baseboard material Minimum lumber dimension is 2 x 6 Use treated lumber if allowed by local codes for your application Always check codes before purchasing treated lumber...

Page 16: ...ts were driven into place and not set in concrete read the information on this page and anchor the high tunnel before continuing Ground Level Ground post below grade Anchor Kit Components Ground post...

Page 17: ...OOR HEIGHT GROUND TO BOTTOM OF HEADER 116673 ENDWALL HEADER KIT 20 WIDE GOTHIC PREMIUM HIGH TUNNEL additional purchase required If the 116673 endwall header kit was purchased for this high tunnel cons...

Page 18: ...NOTE Use recognized construction practices when setting the customer supplied 4 x 4 posts 2 After setting the posts install the header Consult the End Framing Connections Details diagram in the Quick...

Page 19: ...Use DCC4931 Material Consult the End Panel Location diagram near the back of this manual to view the areas that need to be covered with end panel material Use these steps to cut and attach the end pan...

Page 20: ...ing side 4 Inspect the frame assembly for sharp edges or clamps and bolts that may interfere with the installation of the side panels File or tape sharp edges as needed Reposition clamps if needed 5 C...

Page 21: ...screw in each channel and into each rafter See the diagram that follows 2 Continue attaching the u channel sections to the ribbon board or rafters for no ribbon board and work toward the other end of...

Page 22: ...NGTH OF HIGH TUNNEL Raw 5 2 oz Cover Material End of the cover positioned at the end of the frame Position ridge vent holes here at each end Center Line RIDGE VENT KIT INSTRUCTIONS The optional Ridge...

Page 23: ...to the template as shown above Space the three 3 holes 9 on center 9 24 12 3 VENT HOLE TEMPLATE Center Line Length Cover Cover Width 3 0 Step 2 Step 1 9 9 3 3 Edge of Cover Center Line Cover 9 9 3 Ste...

Page 24: ...easurements to ensure you are pulling the cover onto the frame correctly Complete these steps 1 Take the cover and position it at the frame base along one side NOTE Unfold cover and locate edge Cover...

Page 25: ...PROTECTION WHEN INSTALLING SPRING WIRE Step 3 Step 5 7 4 Center side to side and end to end 5 Once main cover is in place and centered begin at the peak at one end and install the 102198A wire spring...

Page 26: ...FOR DROP DOWN SIDES all CD FD models CONTINUE WITH THE INSTALL THE DROP DOWN SIDES PROCEDURE FOR ROLL UP SIDES all CRU FRU models CONTINUE WITH THE INSTALL THE ROLL UP SIDES PROCEDURE 8 Move to the o...

Page 27: ...pe assembly See side profile for pipe identification if needed 106734 band clamp 103496 gearbox and 103544 mounting plate 102717 double drive FA4482B Tek screws for drive pipe FAH009B 1 4 x 4 carriage...

Page 28: ...ed to the end rafter take the 103496 gearbox and place it against the mounting plate at the desired angle 6 Using a marker trace the edges of the gearbox to mark the desired angle on the mounting plat...

Page 29: ...of the second rafter using an FA4482B Tek screw Pipe should remain loose in the band clamp Band clamps support the drive pipe at each rafter except the end rafter where the gearbox is mounted 13 Take...

Page 30: ...OP DOWN PANEL continued ATTACH DROP DOWN PANEL PULLEYS Locate these parts 131S075 pipe conduit CC5525 1 4 panel cord FA4652 Wood Screws AS5020 pulleys Duct tape Drop down panel Panel ID begins with DD...

Page 31: ...nduit section in the pocket add another conduit to the first plain end over tapered swaged end secure joint using an FA4482B Tek screw and tape the conduit joint using duct tape 5 Complete the panel c...

Page 32: ...d for proper panel operation 13 Drive two 2 FA4482 Tek screws with neo bonded washers 102921 into the drive pipe where the cord is located Do not fully seat the Tek screws to the conduit Allow space t...

Page 33: ...of an installed drop down panel with all cords attached and the panel closed Actual high tunnel differs from the example shown INSTALL THE DROP DOWN PANEL continued Cord Pocket with Conduit Drive Pipe...

Page 34: ...stretch the panel end to end along the baseboard 3 Take the first section of customer supplied retaining board and place it against the panel and the baseboard to hold the panel in position NOTE Evenl...

Page 35: ...uide channel Upper end of guide can remain as shown or trimmed a few inches above mounting point See dashed line in photo Guide Channel End of channel to remain a few inches above ground to allow for...

Page 36: ...ead bolts Gearbox can attach to either side of flat mounting bracket 3 Using a 1 4 x 2 carriage bolt FAH005B and nut FALB01B attach square shaft to a tubing adapter 4 Slide square shaft through the Tw...

Page 37: ...billow ropes Corner Baffle Corner Baffle Complete these steps to install a baffle at each corner of the assembled frame 1 Locate four 4 pieces of 102197 single u channel additional 102198A spring wir...

Page 38: ...hs of available u channel INSTALL CORNER BAFFLES continued 4 Take the 108654 roll of 6 mil film and cut a piece to cover the end bay opening framed by the single u channel Roll out the film and measur...

Page 39: ...Panel Conduit Pocket 104211 U channel position Baseboard NOTE Keep panel centered and stretched during this step 4 Secure panel in the lower channel using the 102198A u channel spring NOTE Begin at on...

Page 40: ...procedure that follows to attach the conduit to the roll up side panels using fabric clips ATTACH CONDUIT TO ROLL UP SIDE PANEL Gather the parts Fabric clips CC6212 One for each rafter position Tek s...

Page 41: ...x 2 carriage bolt FAH005B through hole Add 1 4 nuts FALB01B and tighten 4 Test roll up curtain assembly and roll panel to fully opened upper position Do not allow to remain in lower position at this t...

Page 42: ...mine the location of rope hooks and the number of anti billow ropes for each side using the Side Profile diagram in the Quick Start section for your frame length 2 Attach the 117063 rope hooks using w...

Page 43: ...gram below Use five 5 hooks for each side TOP VIEW Photo shows the open end of the hook lag facing the end panels Door Frame 3 Tie a length of rope to the first grommet hole below the guide post brack...

Page 44: ...toward the ribbon board attached along the sides of the frame 2 Using the cover straps as a guide attach two 2 ratchets QH1061 to the board as shown in the following diagrams Roll Up Side Panel Predri...

Page 45: ...Replace film when needed Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the high tunnel to verify that nothing is touching...

Page 46: ...in material sku MATERIAL TO COVER END FRAME AND DOOR FRAME AREAS DCC4931 See dark shaded areas in diagram MATERIAL FOR THE ROLL UP DOOR PANELS QED108181 MATERIAL FOR DROP DOWN ROLL UP SIDES DD084Hxxx...

Page 47: ...e 01 08 21 108179_80_81_82_83_84H FRONT PROFILE 102675 102675 102856 End Rafter 102548 Mid Rafter 102856 End Rafter 102548 Mid Rafter 102856 End Rafter 102548 Mid Rafter 20G166SS401D 20G166SS401D 20GT...

Page 48: ...bly ATTENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT I...

Page 49: ...Ground Level ATTENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WIL...

Page 50: ...el ATTENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT IN...

Page 51: ...evel ATTENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT...

Page 52: ...bly QH1304 Strut Angle Purlin Assembly Length 72 0 4 0 Rafter S on center on center pacing 4 131S075 Angle Purlin Assembly 1 131P0135 11 131S075 Purlin Assembly 1 131P0735 13 131S075 Drop Down Roll up...

Page 53: ...ENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT IN A LOO...

Page 54: ...4 108179_80_81_82_83_84H Revision date 01 08 21 CONNECTIONS View 3 View 1 Rafter Angle Purlin Connection View 5 Rafter Strut Connection View 4 Rafter Ground Post Connection Purlin Mid Rafter Connectio...

Page 55: ...nnection Purlin End Rafter View 5 Rafter Angle Purlin View 1 Connection Purlin Mid Rafter Rafter Ground Post View 2 Connection Purlin Rafter Purlin End Clamp 5 16 x 2 1 2 Bolt Rafter 5 16 Nut Supplied...

Page 56: ...t the end wall frame as shown with the vertical jambs extending above the header 18 to 24 This provides an anchor point for cables if you decide to install them now or in the future Header CUSTOMER SU...

Page 57: ...e details on page 18 Threaded rod and rafter are not shown Roll up door panel is not shown 104188B 1 2 bolt FALB08B nut FAME09B washer FAK16 ROD cut FALB04B nuts FAME08B washer CUSTOMER SUPPLIED END F...

Page 58: ...ver the shaded end frame areas ATTENTION The shaded areas above identify where to install the end panel material Measure each area cut a section from the bulk DCC4931 material and attach the material...

Page 59: ...8 3 4 6 8 3 4 4 11 16 6 5 Ground Level Over The Top 38 9 1 2 465 1 2 Ribbon Board Height Do not install above this line When installing the side purlins allow enough space above the clamps and purlin...

Page 60: ...734 Band Clamp Pulley Rope Baseboard The above photo shows a typical drop down side panel as installed on a sample building This photo applies to buildings equipped with drop down sides only It does n...

Page 61: ...d panel frame to support the panel during winter months and strong winds Secure horizontal support using pins for easy removal Vertical bracing can remain throughout the year if spaced according to ne...

Reviews: