background image

 

 

 

 

 

 

GYM RAX® INSTALLATION

 

STREAMLINE STORAGE 

ENGLISH (U.S.) 

COPYRIGHT © 2020 GYM RAX INTERNATIONAL, INC.  All rights reserved. 

Revision 20A 

Summary of Contents for STREAMLINE

Page 1: ...GYM RAX INSTALLATION STREAMLINE STORAGE ENGLISH U S COPYRIGHT 2020 GYM RAX INTERNATIONAL INC All rights reserved Revision 20A ...

Page 2: ...eley St Santa Monica CA 90404 Phone 888 895 0547 Fax 310 559 9953 info gymrax com www gymrax com We welcome your comments concerning this manual Although every effort has been made to keep it free of errors some may occur When reporting a specific problem please describe it briefly and include the manual part number the paragraph figure table number and the page number Send your comments to GYM RA...

Page 3: ...REV DATE DETAIL 20A 04 23 2020 STREAMLINE INSTRUCTIONS RELEASE The information and data in the most recent revision of this document will supersede all previously published Gym Rax documents and manuals Please verify your copy is the latest available by referring to the digital version online available from Gym Rax ...

Page 4: ... CONTENTS 0 STREAMLINE STORAGE ASSEMBLY 1 PLANNING AHEAD 1 ESTIMATED INSTALLATION TIME 1 RECOMMENDED BOLT TORQUE SPECS 1 REQUIRED TOOLS AND SUPPLIES 1 INSTALL PROCEDURE 2 INSTALLATION REFERENCES Error Bookmark not defined STREAMLINE FOOTPRINT PLATE POSITIONING AND DIMENSIONS Error Bookmark not defined END OF DOCUMENT 8 ...

Page 5: ...ct a GYM RAX customer success representative for clarification Consider the number of persons required to safely install GYM RAX Plan for the method of installation and tools required Take precautions to avoid damaging finishes Do not over torque bolted joints as walls of posts and tubes may crush Never leave unsecured or unstable GYM RAX structures unattended ESTIMATED INSTALLATION TIME 30 minute...

Page 6: ... ASSEMBLY A Insert End Cap into the upper end of Streamline Post The End Cap should push in by hand use a rubber mallet if necessary B Fasten the Self Anchor Plate to the bottom of the Streamline Post using two hex bolts Use a socket or wrench SELF ANCHOR PLATE HARDWARE STREAMLINE POST 3 4 OR 6 END CAP 20 x5 8 HEX BOLTS 2 NO WASHERS ...

Page 7: ...g the procedure in Step 1 B Position the Posts rear edge inline and 48 apart on centers C Anchor Plates requires a firm flat and level ground surface The Posts should be stable and not easily rock fore aft or side to side Check the ground surface and ensure no debris is under the plate and the ground surface is flat and level REAR EDGE ADDITIONAL BAY POSTS IF MULTIBAY ...

Page 8: ...ENSION SYSTEMS 4 REVISON 20A STEP 3 FASTEN CROSSMEMBERS STREAMLINE CROSSMEMBER BACKSIDE 3 8 16 x3 25 BH BOLTS 6 2 PER POST INSERT ADDITIONAL CROSSMEMBERS IF MULTIBAY CONNECT SHORTER OR TALLER BAY CROSSMEMBERS TO HOLE PAIRS WHEN DIFFERENT SIZED BAYS ARE CONNECTED ...

Page 9: ... SUSPENSION SYSTEMS 5 REVISON 20A A Lift one Crossmember at a time and line up holes with the upper 2 holes of the post B Fasten Post Hook Crossmembers to Posts with the 3 8 bolts adding washers and nut as shown Use a 7 32 Hex Key and a 9 16 wrench or socket ...

Page 10: ...STREAMLINE STORAGE ASSEMBLY GYM RAX INSTALLATION STORAGE SUSPENSION SYSTEMS 6 REVISON 20A STEP 4 ATTACH RAX CHANNELS RAX CHANNEL SET 3 8 16 x3 25 BH BOLTS 2 PER POST ...

Page 11: ...ends of the RAX Channel and face the Rax Channels rearward Use the 3 8 bolts with washers on the outsides Use a 7 32 Hex Key and a 9 16 wrench or socket B When multiple bays the inner Rax Channels attach to the middle post using shared hardware Note The button head of the bolt should face outward on the outer posts STREAMLINE STORAGE ASSEMBLY IS COMPLETE SEE INSTURCTION SET FOR ADDING RAX AND PEG ...

Page 12: ...STREAMLINE STORAGE ASSEMBLY GYM RAX INSTALLATION STORAGE SUSPENSION SYSTEMS 8 REVISON 20A END OF DOCUMENT END OF DOCUMENT ...

Reviews: