Page 1: ...Rev 01 5 52 624 00 01 01 Pedestal 108 99 108 22 Installation Operating and Maintenance Instructions...

Page 2: ...changes Table of Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 3 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic sa...

Page 3: ...unpredictable hazards For any resulting damage or personal injury HADEF assumes no liability The unit was designed and built following a risk analysis and careful selection of the harmonized standard...

Page 4: ...r maintenance work DANGER In order to avoid severe injury please pay attention to the following when using the equipment Use protective clothes equipment Do not wear long hair hanging down open Do not...

Page 5: ...ked before delivery Do not throw or drop the accessories Use adequate means of transport Transport and means of transport must be suitable for the local conditions 3 2 Storage Store the accessories at...

Page 6: ...3 7 1000 180 135 13 10 2 2000 240 185 18 23 8 3200 300 230 23 44 5000 360 280 27 75 12500 530 420 38 195 20000 645 510 46 360 108 22 capacity kg rope pulley diameter max rope diameter mm weight outer...

Page 7: ...minimum dimension M from the centre of the drum to the centre of the sheave or from sheave to sheave must be observed Illustration 3 NOTICE Skewed running and non compliance with the minimum distances...

Page 8: ...with more than one motor driven hoist movement i e lifting and trolley movement must be tested by a licensed qualified person before putting in operation An exception is hoists ready for operation ac...

Page 9: ...service every 12 months check screw connections X check wear and tear of rope pulley X check smooth running of rope pulley X check smooth running of rope within pulley X equipment check by a qualified...

Page 10: ...s mandatory that all steps for decommissioning the machine are carried out in the indicated sequence First secure the working area for decommissioning leaving plenty of space Read the chapter Safety i...