background image

 

 

 
 
 

 

DIAMOND CORE DRILL

 

SPJ-122He-U 

 
 
 
 
 

  INSTRUCTION MANUAL   

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 

  Thank you for purchasing our products. 

  Before using, please read Instruction manual carefully, and use the machine 

safety by following the instructions. 

  After reading, please keep it where anyone can utilize. 

Summary of Contents for SPJ-122He-U

Page 1: ...2He U INSTRUCTION MANUAL Thank you for purchasing our products Before using please read Instruction manual carefully and use the machine safety by following the instructions After reading please keep it where anyone can utilize ...

Page 2: ...words WARNING CAUTION and POINT which are meant as follows WARNING It is assumed that if the user uses the machine wrongly it would be the risks that the user could be died or injured CAUTION It is assumed that if the user uses the machine wrongly it would be the risks that the user could remain the disabled or damage for the materials POINT Important notices for the installation of machine instru...

Page 3: ...D ACCESSORIES 7 5 APPLICATIONS 7 6 GENERAL DRAWING AND SPECIFICATIONS IN OPERATION 8 7 OPERATIONAL INSTRUCTIONS 1 Anchoring Core Drill 9 2 Anchoring Core Drill by Anchor Bolt 9 8 MAINTENANCE AND INSPECTION 1 Maintenance 11 2 Regular Servicing 11 9 FOR REPAIRING 13 10 INFORMATION ON NOISE EMISSIONS 13 11 WARRANTY 13 12 CE DECLARATION OF CONFORMITY 14 ...

Page 4: ... Wear cap or hair cover in case that you have long hair 5 Wear ear protector such as earplug or ear muffs Wear ear protector in the place of noise 6 Wear safety glasses Wear safety glasses during working If there is dust please wear the dust mask 7 Do not work with improperly posture Fix the footing and maintain the balance at all times 8 Work carefully without staying alert When using the electri...

Page 5: ...tch please make sure that the key and the wrench which are used for the inspection and adjusting are removed 15 The electric machines are maintained carefully Regarding exchanging the options please follow the instruction Keep the grip dry and clean and avoid the oil or grease Inspect the cord regularly In case that there are damages please contact to the distributors or CONSEC for repairing In ca...

Page 6: ... Use the proper voltage which is indicated on the nameplate In case that you apply for the voltage which is over the indicated voltage it will cause the accidents 7 Fix the Pole Base properly It is extremely important to fix the pole base securely If it is not fixed securely the Core Bit might be damaged by rattling of Core Drill or jammed 8 Use the Water Collector for sure Use Water Collector pad...

Page 7: ...d efficiently 2 When drilling please supply the water for sure Overheating of Core Bit reduces not only drilling performance but also its life So make sure to keep supplying water during drilling operation Use clean water only Using the dirty water may cause machine failure 3 Do not turn on the motor with Core Bit facing to the drilling surface It causes the damages for Core Bit and Core Drill 4 W...

Page 8: ... dial is LOCK 252 248 316 177 Feeding handle Quick detachable handle Drill carriage adjust bolt 4 places Urethan hose Lock dial Cord 2 3m Motor Switch Built in Circuit breaker Carbon cap Name plate Drill carriage adjust bolt 2 places CEE17 Plug Unified screw 1 1 4 7 UNC The outside of Main shaft ...

Page 9: ... outside Unified screw 1 1 4 7 UNC inside G 1 2 Drill Head weight Excluding cord 5 0kg 4 STANDARD ACCESSORIES Instruction manual 1 5 APPLICATIONS This tool is Core Drill for drilling in concrete Core drilling in concrete for road dam tunnel and bridge construction Sampling test pieces Core drilling of pilot hole for guard rail post and fence post Core drilling in concrete for wiring and plumbing f...

Page 10: ...AL DRAWING AND SPECIFICATIONS IN OPERATION Drill Head installed on to 40 Pole Base Feeding handle Core Bit Water Collector 40 Pole Base Bolt square washer Hex nut Leveling Bolt Water collector fitting Drill Head ...

Page 11: ...gn Main shaft with the hole to be drilled 5 Adjust leveling with leveling bolts so as to eliminate rattling of Pole Base After completion of adjustment secure leveling bolt with wing nut 6 Tighten Hex nut to secure Pole Base 3 Installation of Core Bit Thread Core Bit onto Main shaft 4 Installation of Water Collector Secure Water Collector with Water collector fitting WARNING Be sure to use Water C...

Page 12: ...t with work surface While starting to drill apply light pressure on Feeding handle until drill bit penetrates to 5 10mm depth Then keep drilling under uniform pressure WARNING 1 If motor is switched on with Core Bit contacts on the work surface it causes Core Bit fracturing or Core Drill failure resting in hazardous accidents 2 Wait until the rotation of Core Bit increases to the full and then sta...

Page 13: ...d with the soapy water 2 Maintenance for motor After entire operation is over secure Drill Head onto Pole Base run motor with no load and remove dirt and dust from motor interior 2 Regular Servicing 1 Checking of Carbon brush 1 How to check Remove Carbon cap using flathead screw driver etc and take Carbon brush out After replacement secure Carbon cap 2 Item to be checked If the wearing of the Carb...

Page 14: ...he part of Drill Carriage ASSY by screwdriver in a balanced POINT 1 If you screw the Drill carriage adjustment screw tighten it will be hard to rotate the Feeding handle 2 If the slide face is worn away adjustment will be needed 3 Checking of attaching screws Check every attaching screws for loosening periodically If found loose tighten it Drill carriage adjust bolt 4 places Drill carriage adjust ...

Page 15: ...ents at a distance of 1 meter from the surface of the machinery and at height of 0 6 meter from the floor during no load operation 11 WARRANTY We will guarantee the HAKKEN Core Drill SPJ 122He U for 6 months from the date of delivery During this period we will rectify material and production defects free of charge We are not responsible for any other damage direct nor indirect other than this This...

Page 16: ...PJ 122He U Council Directive 2006 95 EC 2004 108 EC 92 31 EEC 2006 42 EC Relative Standard EN292 1 EN292 2 EN55014 1 EN55014 2 EN61000 4 2 EN61000 4 4 EN61000 4 5 EN61000 4 6 EN61000 4 11 EN61029 1 IEC61029 1 IEC61029 2 6 Year To Begin Affixing CE Marking 2011 Place Hiroshima Japan Signature Name Hidetaka Sasaki Title President Date June 2011 The documentation referred herein is retained in our au...

Page 17: ... 15 MEMO ...

Page 18: ... 16 MEMO ...

Page 19: ... 17 MEMO ...

Page 20: ... 18 Main office 4 6 8 Shoko Center Nishi ku Hiroshima 733 0833 Japan International Department 1 7 5 1 Sakaimachi Naka ku Hiroshima 730 0853 Japan Phone 81 82 297 3231 Fax 81 82 297 3230 E1791 1 ...

Reviews: