Premier Vertical Lift
Instructions
Step 1: Upright posts
8- 3/8” x 1” carriage bolts SS
8- 3/8” flange nuts
Step 2: Footpads and Legs
4- 3/8” x 3-1/2” bolts SS
4- 3/8” flange nuts
4- Long leg pins
4- hair pin clips SS
Step 3: Winch mount
2- 3/8” x 1” carriage bolts SS
2- 3/8” flange nuts
Step 4 and 5: Base tubes
16- 3/8” x 1” carriage bolts SS
16- 3/8” flange nuts
Step 7: V braces
4- 3/8” x 2-3/4” bolts SS
1- 3/8” x 1-1/2” bolts SS
3- 1/2” x 6” bolts SS
5- 3/8” flange nuts
3- 1/2” aluminum nuts
Step 6: Cable mount brackets
6- 3/8” x 1” carriage bolts SS
6- 3/8” flange nuts
Step 8: Bed and cables
8- 3/8” x 1” carriage bolts SS
8- 3/8” flange nuts
Step 9: Cable mounts
4- 5/16” x 1” carriage bolts SS
4- 5/16” flange nuts
10- 5/8”-11 aluminum nuts
Step 10: Flat braces
4- 3/8” x 2-3/4” bolts SS
4- 3/8” x 1” carriage bolts SS
4- 3/8” flange nuts
Cable Mount Bracket caps
3- 1-1/2” x 3” Black Caps
www.harbor-master.com