background image

24

                Phone (816) 796-2900

                    Fax. (816) 796-3333

  Email: info@HEMCOcorp.com

HEMCO Corporation

711 S. Powell Road

Independence MO, 64056

MM-UNIMAX 10.01.18

Visit www.HEMCOcorp.com

Call Toll Free: (800) 779-4362

Lab Planning Solutions

HEMCO

R

Other HEMCO Products

UniFlow LE

UniFlow SE AireStream 

High Performance

Energy Effi

  cient 

Laboratory Fume Hoods

UniFlow CE

UniFlow LE FM

Safety Equipment

NSPE

Scienti

fi

 c Equipment

   and Furniture Association

SEFA

ASME

American Society of
Mechanical Engineers

National Fire   
Protection Association

  

NFPA

AEE

Association of
Energy Engineers

Made 

In The 

U.S.A.

1

Installation, Operation, Maintenance Manual

UniMax Ventilated Hood Enclosure

Designed and Built for 

            Email info@HEMCOcorp.com

   Phone (816) 796-2900

   Fax (816) 796-3333

HEMCO Corporation

711 S. Powell Road

Independence MO, 64056

Visit www.HEMCOcorp.com

Call Toll Free: (800) 779-4362

Lab Planning Solutions

HEMCO

R

Summary of Contents for UniFlow CE

Page 1: ...low CE UniFlow LE FM Safety Equipment NSPE Scientific Equipment and Furniture Association SEFA ASME American Society of Mechanical Engineers National Fire Protection Association NFPA AEE Association of Energy Engineers Made In The U S A 1 Installation Operation Maintenance Manual UniMax Ventilated Hood Enclosure Designed and Built for Email info HEMCOcorp com Phone 816 796 2900 Fax 816 796 3333 HE...

Page 2: ...quipped with Modular Construction featuring wall panels that are 2 thick with chemical resistant composite resin surface skin panels Structural framework to be clear of anodized aluminum extrusions A rear varaflow baffle is mounted on the rear wall of hood Top mounted exhaust collar s 23 HEMCO Laboratory Planning Solutions www HEMCOcorp com info HEMCOcorp com Fax 816 796 3333 Tel 816 796 2900 HEMCO C...

Page 3: ... with any crate damage even minor that the bill of lading be signed for noting crate damage pending further inspection for concealed product damage If the equipment has been damaged in transit immediately notify and file a claim with the carrier Do not return to HEMCO If this procedure is not followed the carrier will reject the claim and the consignee will suffer the loss Please notify HEMCO so tha...

Page 4: ...components to erection site and segregate Note identification markings on each panel and inside aluminum extrusions Note Insertion of the wall panels into the base may be aided by utilizing a thin flexible putty or spackling knife to guide the panel into the track Note Be very careful as sub assemblies and wall sections can be very heavy particularly the basin and the rear wall section Use dollies ...

Page 5: ... marked with Location Labels HEMCO Laboratory Planning Solutions www HEMCOcorp com info HEMCOcorp com Fax 816 796 3333 Tel 816 796 2900 HEMCO Corporation 711 South Powell Road Independence MO 64056 R Secure with 10 sheet metal screws Attach Panel Right Side Walls A B to Back Wall Section to Right Side Back Wall Attach Panel Center Back wall to Back Wall to Left Wall Panels with 10 sheet metal scre...

Page 6: ...place products found to be defective in materials or workmanship within the period set forth above provided that a the product has not been subjected to misuse contamination neglect accident incorrect wiring improper installation or servicing or used in violation of instructions furnished by HEMCO Corporation And b as to any defects in materials or workmanship covered by this warranty the product ...

Page 7: ...rials inside the hood at least 8 inches from the door opening When not working in the hood or when a process is in operation keep the doors closed Do not permanently store chemicals inside the hood Promptly report any hood that is not functioning properly to your supervisor The doors should be closed and the hood tagged and taken out of service until repairs can be completed When using extremely h...

Page 8: ...l 77 5 8 77 5 8 17 HEMCO Laboratory Planning Solutions www HEMCOcorp com info HEMCOcorp com Fax 816 796 3333 Tel 816 796 2900 HEMCO Corporation 711 South Powell Road Independence MO 64056 R Seal any air gaps and joints of the enclosure not previously sealed with silicone sealant Typical air gaps would be walls to ceiling floor perimeter etc General clean up of site installation of any other equipme...

Page 9: ...ot designed to support more than 50 60 pounds of Load Secure upper ceiling connections with 10 machine bolt interior and nylon nuts exterior Cover screw heads with 10 PVC cover caps Install Top Section of Light fixture trough roof of ceiling panel Thread bottom section of Light fixture into the top section from inside the Hood 9 HEMCO Laboratory Planning Solutions www HEMCOcorp com info HEMCOcorp co...

Page 10: ...iling panels in place on the seat of the h extrusions Be careful of flexing the ceiling panel while setting it in place to avoid damage Secure with pro vided 10 sheet metal screws Set the 1 Left ceiling panel in place on the seat of the h extrusions Light fixtures are orientated to the front of the enclosure and the exhaust outlet is at the rear Secure with provided 10 sheet metal screws 15 HEMCO La...

Page 11: ...cutcheon Install Back Top 7 Center Left into Top Center Left wall escutcheon Install Right and Left Front Post Electrical Strips on front corner posts 11 HEMCO Laboratory Planning Solutions www HEMCOcorp com info HEMCOcorp com Fax 816 796 3333 Tel 816 796 2900 HEMCO Corporation 711 South Powell Road Independence MO 64056 R View of Ceiling Panels from the top Aluminum channel shown in position betw...

Page 12: ...into place Secure lower connection with provided 10 sheet metal screws Install Right Side Wall Top 4 into escutcheon on top of Right Side Wall panels A B 13 HEMCO Laboratory Planning Solutions www HEMCOcorp com info HEMCOcorp com Fax 816 796 3333 Tel 816 796 2900 HEMCO Corporation 711 South Powell Road Independence MO 64056 R Install Front Center Top 2 into Top Front wall escutcheon Install Left T...

Reviews: