INSTALLATION MANUAL
HUBER+SUHNER AG
Fiber Optics
Fiber Management Systems
DOC-0000730269 Rev D
Date: 01.09.2016
Page 1 of 15
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
IANOS EDR (Equipment Distribution Rack) chassis
TABLE OF CONTENTS
UNPACKING IANOS CHASSIS 1U OR 4U
2
INSTALL IANOS 1U OR 4U CHASSIS IN RACK
3
REAR CABLE MANAGER FOR 1U AND 4U (OPTIONAL)
3
INSTALL ZERO SPACE CHASSIS
5
CHASSIS LAYER LABELING
6
CHASSIS LAYER LABELING REDUNDANT PATHS (OPTIONAL)
6
CHASSIS LABELING FOR 1U AND 4U
6
INSTALL AND WIRING MODULES (FROM THE FRONT)
7
REMOVING MODULES (FROM THE FRONT)
8
INST WIRING MODULES (FROM THE REAR)
10
REMOVING MODULES (FROM THE REAR)
10
MODULE: SPLICE MODULE
11
MODULE: PRE-TERMINATED MODULE
12
APPLICATION: ALL CABLES FROM THE SAME SIDE (OPTIONAL)
14
APPLICATION: PART LOADED CHASSIS (USE OF OPTIONAL MODULE BLANKS)
14
This document is downloaded via www.farbin.ir as an authorized distributer in IRAN.