background image

 

 

ASSEMBLY INSTRUCTIONS 

READ CAREFULLY 

 

 

 

 
 
 
1.  Center a "6" thick concrete base around installed BFP. 

A. Place expansion material around riser pipes and place conduit for electrical power 
before placing concrete.  

CONCRETE SHOULD BE FINISHED ABSOLUTELY 

LEVEL, FLAT AND SMOOTH. 

 Allow concrete to cure. 

 

B. Mark concrete with outside dimensions of enclosure.  (Center around BFP). 

 

Reviews: