ICC
INDUSTRIAL CONTROL COMMUNICATIONS, INC.
Page 1 of 10
05.23.2014
0720-160-MC
1600 Aspen Commons, Suite 210
Middleton, WI, USA 53562
Tel: (608) 831-1255
Fax: (608) 831-2045
Email: sales@iccdesigns.com
ETH-1000 Chillgard LC Quick Start Guide for BACnet
MS/TP
This document provides a brief overview of the connections and settings that must be used to connect a
preconfigured ETH-1000 gateway to a MSA Chillgard LC Refrigerant Monitor. This document also contains the
BACnet object mapping for the application and some troubleshooting tips. For more information, please refer to
the ETH-1000 User’s Manual available at
http://www.iccdesigns.com/products/millennium/eth-1000.html
.
Wiring
Power Supply Wiring
A 7 – 24V DC power supply must be connected to the gateway’s terminal block at terminals TB:5 (POWER) and
TB:6 (GND) as highlighted in Figure 2.
Figure 1: Terminal Block Power Supply Connections