background image

©  2019 Inepro B.V. All rights reserved

Installation Manual | PayCon Touch - Pillar

PayCon Touch - Pillar

Summary of Contents for PayCon Touch - Pillar

Page 1: ...2019 Inepro B V All rights reserved Installation Manual PayCon Touch Pillar PayCon Touch Pillar...

Page 2: ...his manual contains information on how to do that please read it carefully Due to continuous product improvements this manual is subject to changes without notice We strongly recommend you read the li...

Page 3: ...the preparation of this document the publisher and the author assume no responsibility for errors or omissions or for damages resulting from the use of information contained in this document or from...

Page 4: ...Table of Contents Introduction 1 Check Kit Content 3 Hardware Setup 10...

Page 5: ...ice This dev ice is in conformity with the EMC directiv e and low v oltage directiv e CE Conformit Europe ne Conform European Norm End of life directives Inepro is pay ing a lot of attention to env i...

Page 6: ...I Introduction Part...

Page 7: ...Introduction 2 Introduction This instruction is for assembling the Inepro PayCon Touch stand We shall 1 Check the content of the kit read more on page 2 Prepare and construct the hardware on page 4 11...

Page 8: ...II Check Kit Content Part...

Page 9: ...l requirement for installation Copier device 320090 PayCon Touch Pillar Copier Interface Kit Please check the content of this box and make sure all kits are complete 320090 PayCon Touch Pillar Copier...

Page 10: ...5 PayCon Touch Pillar 1x PayCon Touch Cables and Cover Package 1x PayCon Touch Kit...

Page 11: ...Package you should find 2xUSB 2 0 A B Type cables 1 8m 2xNetworkpatch cable 1 5m 1xPower cable 1xRubber cover 1xSet of Copier Interface cables accessories Beware This set may differ as it depends on y...

Page 12: ...PayCon Touch Base Package In the PayCon Touch Base Package you should find 1x PayCon Touch Base Plate 1x Copier Interface Board 1x Copier Interface Board Cover 2x M10 x25mm Bolts 2x M10 x20mm x2mm Wa...

Page 13: ...ck Kit Content 8 PayCon Touch Kit In the PayCon Touch Kit you should find 1x User Manual 1x Release Notes 4x Dome Head Alan hexkeymachine screws 1x PayCon Touch 1x Networkcable 2 5m 1x Power adaptor s...

Page 14: ...9 PayCon Touch Pillar PayCon Touch Kit...

Page 15: ...III Hardware Setup Part...

Page 16: ...ardware Setup We will construct the PayCon stand using these tools An M17 spanner A Hex Alan Umbrako Inbus key 2 5mm A Philips type 1 screwdriver 1 Attach the base of the pillar to the pillar using th...

Page 17: ...Hardware Setup 12 2 Fasten the copier interface with 6 of the 10 machine screws...

Page 18: ...RJ 45 connector to the shielded connector on the interface board 5 Connect the power cable to the power outlet on the interface board 6 Connect both the USB cables 7 Connect the copier interface cabl...

Page 19: ...Hardware Setup 14 10 Mount the cover over the Copier Interface Board with the last 4 screws...

Page 20: ...ouch Pillar 11 Feed the cables trough the pillar 12 Now we will apply the cover Make sure the cut part of the cover is at the bottom of the pillar 13 Fit the cover on the pillar Push it into place fro...

Page 21: ...Hardware Setup 16 14 Fasten the PayCon Touch to the pillar start with the 2 hex key screws on back...

Page 22: ...PayCon Touch Pillar 15 Finish with the two hex key screw on the front and connect the cables Make sure the cable from the shielded RJ 45 port is connected to the shielded RJ 45 port in the PayCon Tou...

Page 23: ...Hardware Setup 18 16 You have finished constructing the PayCon Touch Stand...

Page 24: ......

Reviews: