background image

QTY

SIZE

COLOR

Style

QTY

Style

4

14' 4"

Red

Hip Rafter

2

Half Crown AT

4

10' 10"

Green

Keder

4

Regular Corners

2

10' 6"

Green

Rafter

6

Regular T's

11

9'4"

White

Spreader

10

Ratchets

10

7' 8"

Black

Legs

10

Baseplates

52

Tent Pins

10

Weights / Stakes

1

Brace Package

Pre-Site  Inspection- Call your local utitlity companies prior to installation for any underground obstructions.  

1. Layout the frame parts in the estimated location peertaining to the diagram. The spreader pipe is placed out to form
the perimeter, and the rafters are laid in the interior location.

2. Start with one of the Half Crowns. Attach the hip rafters (14’4’’ red) to the Half Crown at the second and fourth
points by sliding the pole over the fitting and lining up the holes in the pole with those in the fitting. Place a pin in the
first hole to secure the pole in place.

3. Attach the 2 Rafter poles (10’6’’ green) to  points - three and the 10'10" keder pipe to points one and five of the
 Half Crown using the same technique as in step 2.

4. Attach a spreader (9’4” white) to the Half Crown, and connect it to the other Half Crown.

5. Connect the corner fittings to the hip rafter by sliding the pole over the fitting. Line up the hole of the pole with the first
hole of the fitting and place a pin.

6. Join the regular t fittings to the poles by sliding the pole over the fitting. Line up the hole of the pole with the first
hole of the fittings and place a pin.

7. The perimeter is ready for assembly. Connect the Regular T to the corners using the spreaders (9’4” white). Slide
the poles over the fittings, line up the holes, and pin the pole and fitting together. When all of the spreaders have been
secured in place, the frame will be complete.

8. Slide the keder on the tent through the keder pipe starting at the regular t going up through the Half Crown, then 
come back down the other side. Then slide the middle tent top piece through the middle. Repeat the step for the 
other end tent top section.

9. Secure the tent top to the frame by fastening the straps on the inside of the tent at each corner location.

10. Start at one corner and manually lift the frame so that the leg (7’8” black) can slide over the corner fitting.
Pin the leg to the fitting. ( When raising the tent, raise INTO the wind)

11. Proceed to work your way around the tent putting one leg in at a time until all legs are standing and pinned.
Put baseplate under legs and attach 1" ratchets fron the "O" rings at the ends of the valance to the baseplates.
Tighten loosely.

20 x 30 All Trac Frame Tent Instructions page 1 of 2

Corner

Optional Items

Infinity Tent Sales

20 x 30 All Trac Frame Tent Set Up Instructions

Components

Pipe

Corner

Half Crown 

Regular T

Half Crown

Half Crown

10' 10" 
Keder Pipe

10' 10" 
Keder Pipe

10' 10" 
Keder Pipe

10' 10" 
Keder Pipe

Reviews: