background image

6000 Series Electric Strike DS Replacement Kit

PARTS LIST

Installation Instructions

Figure 1

Figure 2

Solenoid

plug

Strike box

INSTALLATION

Faceplate

Button head

screws (2)

Strike mounting screws

l

Turn off power to strike before removal.

NOTES

!

Remove strike from door frame, unplug

wiring plugs, and remove strike box from

faceplate as shown (Figure 1).

Remove box cover (5/64” Allen wrench)

and remove old double switch (Figure 2).

VON DUPRIN

®

Strike box

cover

DS plug

Configuration of

faceplate and

strike box may vary

from illustration

Old double

switch

1

2

Double Switch

Type A, Type A Gold

Type B, or Type B Gold

Button head screw

#6-32 X 1/4”  (2)

Strain relief

931229_00(0)  Copyright © 2001 Ingersoll-Rand Company. All rights reserved.

Reviews: