background image

Thank you for buying the Intel

®

 Server System SC5650HCBRP.

The following information will help you assemble your Intel® Server System
SC5650HCBRP and install components.

These guides and other supporting documents are located on the web at 
http://support.intel.com/support/motherboards/server/SC5520HC/

If you are not familiar with ESD (Electrostatic Discharge) procedures
used during system integration, please see the Intel® Server 
System SC5650HCBRP Service Guide, available on the Intel® Server
Deployment Toolkit CD or at
http://support.intel.com/support/motherboards/server/SC5520HC/.

Please boot to the Intel® Server Deployment Toolkit CD first for BIOS and
firmware configuraion and updates.

Read all cautions and warnings first before starting your server
system integration.

Intel

®

 Server System SC5650HCBRP

Quick Start User's Guide

Intel is a registered trademark of Intel Corporation or its 

subsidiaries in the United States and other countries.  

*Other names and brands may be claimed as the 

property of others.  Copyright © 2009, Intel Corporation.

All rights reserved.

Warning

 

Read all caution and safety 

 

statements in this document 

 

before performing any of the 

instructions.  Also see the 

Intel

®

 

Server Board and Server Chassis 

Safety Information

 document at:

http://support.intel.com/support/

motherboards/server/sb/cs-010770

.htm

 

for complete safety information.

Warning

 

Installation and service of 

 

this product to be performed 

 

only by qualified service 

personnel to avoid risk of injury from 

electrical shock or energy hazard.

Tools Required

Caution

 

Observe normal ESD

 

[Electrostatic Discharge]

 

procedures during system 

integration to avoid possible 

damage to server board and/or 

other components.

        Anti-static

wrist strap

     #2 Phillips*

screwdriver

E81444-002

Hex nut driver

(0.25 in or 

6 mm)

6

Remove Fan Duct

Remove fan duct assembly as shown.

1

1

2

Remove Side Cover

1
2

Remove two screws.
Push in latch.

3

Slide side cover 

rearward and remove.

2

3

1

1

3

Remove Front Bezel Assembly

3

Disengage three bezel clips that attach the right side of the

bezel to the right side of the chassis and remove.

2

Rotate left side of front bezel assembly outward slightly.

1

Lift outward two bezel tabs on left side of bezel assembly to

detach bezel assembly from `the chassis.

2

3

1

1

3

3

1

Preparing
the Chassis

Observe normal ESD 

(Electrostatic Discharge) 

procedures.

Place your 

Intel

®

 Server 

Chassis on a flat anti-static 

surface to perform the following

integration procedures.

Observe ESD procedures before 

reaching inside to make 

server board connections 

or install components.

Minimum Hardware Requirements

To avoid integration difficulties and possible board damage, 

your system must meet the following minimum requirements:

 

Processor:

  Minimum of one Intel

®

 Xeon

®

 Processor 

  5500 Series. Maximum 95-W processor.

 

Memory Type:

  Minimum of one 1 GB, 240-pin, 

  RDIMM or UDIMM, DDR3-800, DDR3-1066, or DDR3-1333.

 

Hard Disk Drives:

 SATA/SAS

 

SAS Controller:

 One SAS add-in card or SAS module card

 

Heatsink(s):  

Minimum of one active heat sink.

For a complete list of compatible

 

processors, heatsinks,

 

and memory, see:

http://support.intel.com/support/motherboards/server/S5520HC/ 

5

Remove Hot Swap Drive Cage

3

2

2

2

Push blue plastic release mechanism upward to

unlatch hard drive cage.

1

Remove Hard Disk Carrier from Hot Swap Drive Cage

and disconnect all cables from the Expander Hot Swap

Drive Cage.

Once released, pull hard drive cage out of chassis.

3

1

4

Install Tool-less CD-ROM or DVD-ROM Drive

1

2

Connect power cables and data cables to rear 

of the CD-ROM or DVD-ROM drive.

6

3

5

4

6

Data

Power

3

2

1

Remove EMI shield from 5.25-inch device

drive bay.
Make sure latch is in "unlock" position.

Line up holes in CD-ROM or DVD-ROM

drive with holes in chassis. 
Move latch to "lock" position.

Insert CD-ROM or DVD-ROM drive into

device drive bay.

5

4

An additional 4-pin IDE male-to-SATA 15 pin power cable 

adapter may be needed if the CD-ROM or DVD-ROM does 

not have a 4-pin power connector.
Data cables are included with the Intel

®

 Server System.

7a

Install the Processor(s)

A.  Open the Socket Lever

Push the lever handle down 

and away from the socket to 

release it.
Rotate the lever open all 

the way.

B.   Open the Load Plate

Push the rear tab with your 

finger tip to bring the front 

end of the load plate 

up slightly.

Open the load plate as shown.

A

B

A

B

D.  Remove the 
    Processor 
    Protective Cover

Take the processor 

out of the box and 

remove the protective 

shipping cover.

A

A

C.   Remove Socket 
    Protective Cover

Save the protective cover.

Grasp the socket protective cover 

by the two tabs and carefully lift 

straight up as shown.

A

A

B

Cautions:

2. When unpacking a processor,

     hold by the edges only to avoid

     touching the gold contact wires.

1.  When opening a socket, DO NOT

     TOUCH the gold socket wires.

B

A

To avoid damage, DO 

NOT DROP the cover 

onto the socket wires 

or components.

7

b

Install the Processor(s) ... 

continued

F.   Close Load Plate and Socket Lever

Close the 

load plate 

all the 

way as 

shown.

Close the socket lever and ensure that 

the load plate tab engages under the 

socket lever when fully closed.

With your finger, push down on the 

load plate as shown.

E.   Install the Processor

C

A

B

 

CAUTION: The underside 

 

of the processor has 

components that may damage 

the socket wires if installed 

improperly.

Processor must align 

correctly with the 

socket opening 

before installation.

DO NOT DROP processor 

into the socket!

C

B

A

Components

Orient the processor with the socket 

so that the orientation notches on

the processor align with the two 

orientation posts on the socket.

A

Install the processor as shown.

A

Orientation Posts

Orientation Notches

8

Install DIMM Memory Modules

To Install DIMMs:

Memory Configurations and Population Order:

The Intel

®

 Server System SC5650HCBRP

supports upto 12 DDR3-800/1066/1333

RDIMMs or UDIMMs.

DDR3 DIMM Memory Identification:

DIMM notch and

socket bump must

align as shown.

Open both DIMM socket levers.

Push down firmly on the DIMM until it

snaps into place and both levers close.

Insert DIMM making sure the connector edge 

of the DIMM aligns correctly with the slot.

C

A

D

IMPORTANT!  Visually check that each

latch is fully closed and correctly

engaged with each DIMM edge slot.

E

Note location of alignment notch.

B

CAUTION: Avoid touching contacts

when handling or installing DIMMs.

E

DDR3

A

C

D

B

 M

inimum of one 1 GB DDR3-800/1066/1333 RDIMM or UDIMM.

 

Install from first slot of each channel (A1, B1, C1, D1, E1, or F1).

 

Install Quad-Rank DIMM from first slot of each channel.

 

Channel D, E, and F are not available when CPU 2 socket is empty.

 

Mixing of RDIMMs and UDIMMs is not supported.

CPU 1 Socket

CPU 2 Socket

DIMM A2

DIMM A1

DIMM B2

DIMM B1

DIMM C2

DIMM C1

DIMM D2

DIMM D1

DIMM E2

DIMM E1

DIMM F2

DIMM F1

Go to Side 2

Reviews: