background image

User Guide

Solar light Tower

SL-S400

Summary of Contents for SL-S400

Page 1: ...User Guide Solar light Tower SL S400 ...

Page 2: ...CONTENTS PAGE NO S 1 SAFETY 1 2 2 ASSEMBLY 4 7 3 STARTING PROCEDURE 8 4 STOPPING PROCEDURE 9 10 5 CHARGER OPERATING INSTRUCTIONS 11 6 7 WIRING DIAGRAM 12 13 14 ...

Page 3: ...the machine 1 6 Some or all of the following warning signs symbols and or PPE pictograms may appear throughout this manual You MUST adhere to their warnings Failure to doso may result in personal injury to yourself or those around you DANGER Indicates a hazard which if not avoided could result in serious injury or death WARNING Indicates a hazard which if not avoided could result in serious injury...

Page 4: ...ts for battery charging but in order to prevent safety problems caused by overcharge of the protective plate and failure of the protective function it is not recommended to charge for a long time The battery shall be taken out after it is fully charged In addition the original charger or the charger attached to the battery must be used during charging and the operation and use must be carried out ...

Page 5: ...Item Description Quantity 1 LED Lamp 4 2 Mast 1 3 M10x30 Bolt 6 4 Ø10 Washer 6 5 Ø10 Spring 6 SL S400 1 2 3 4 5 3 2 ASSEMBLY ...

Page 6: ...ption Quantity 6 7 8 9 10 11 12 13 Transport Handle 1 Ø12 Washer 1 M12x30 Bolt 1 M5x16 Flange Bolt 2 Circuit Breaker Box 1 Electrical Box for Lamps 1 M6x16 Flange Bolt 2 Stabilisers 1 6 7 8 11 12 9 10 13 SL S400 4 ...

Page 7: ...Item Description Quantity 14 M12x25 Bolt 8 15 Ø12 Washer 8 16 Ø12 Spring 8 14 15 16 SL S400 5 ...

Page 8: ...17 Item Description Quantity 17 M8x20 Bolt 4 SL S400 6 ...

Page 9: ...SL S400 7 ...

Page 10: ...lace the lighting tower in the area where lighting is needed 2 1 Press down the brake and open the stabilisers 2 2 Adjust the angle of the LED lamps 2 3 Rotate the mast handle clockwise When the mast reaches its maximum height the safety lock pin will automatically lock the mast DO NOT shake the handle vigorously to avoid damaging the mast 8 210 ...

Page 11: ... Connect the lighting tower plug to the 2 5 Turn on the lighting power switch 3 0 Turn off the lighting tower switch 3 1 9 inverter and switch on the inverter breaker to ON Switch off the INVERTER breaker ...

Page 12: ...3 2 Pull out the safety lock pin and rotate the mast handle anti clockwise until the mast is fully retracted 3 3 Close the stabilisers and press the brake downwards to release 10 1 2 ...

Page 13: ...le of the solar panel then lock the knob 5 5 Swich off mains breaker 5 6 Plug to inverter input 5 7 Switch on INPUT breaker 5 8 Switch on mains breaker 5 2 Loosen the lock pin and pull out the solar panel sideways 5 3 Plug to 3 sockets 1 2 3 4 x2 SOLAR INPUT INVERTER x3 1 2 3 4 SOLAR INPUT INVERTER AC220V INPUT ON OFF 11 ...

Page 14: ... be placed on firm flat and level ground 6 2 The vertical inclination between the lighting tower and the ground should not exceed more than 5 degrees 6 3 The wind speed should not exceed 31mph 50kmh 5 12 6 OPERATING INSTRUCTIONS ...

Page 15: ...7 WIRING DIAGRAM L N BATTERY MPPT CONTROLLER 40A B B SOLAR INPUT 54V 8A LOAD Solar series 13 ...

Page 16: ...7 SPECIFICATION L N BATTERY B B SOLAR INPUT 18V 24A Solar parallel LOAD MPPT CONTROLLER 40A 14 7 WIRING DIAGRAM ...

Page 17: ...ower Model Number SL S400 Light Coverage 1500m2 Lamps LED Lamp Wattage 4x100w Life Expectancy 30000hrs Mast Vertical Manual Max Height 5m New weight 170Kg Dimensions L x W x H 1170 x 880 x 1950mm mast down 15 ...

Page 18: ... Power Equipment Manufacturing Co Ltd No 7 Rongsheng Road Cuibei Henglin Town Changzhou City Jiangsu Province P R China Tel 86 519 85099059 Fax 86 519 85099059 Email info itc power com cn Http www itcpowerworld com ...

Reviews: