background image

Installation Instructions 

JATCO Environmental Protection Tank 

J-

5

000 SM-P 

2

00 ABV

*INSTRUMENTATION GAS IS MANDATORY FOR SUPPLY GAS*

The JATCO Environmental Tank must be installed at a level which will allow the waste 
liquids to be disposed of to gravity flow into the tank. 

IMPORTANT: The top of the tank must be below the level of waste liquids to be 
received.

 

Inlet and the outlet check valves are both teed from the same port near the bottom of the tank 
(end  opposite  the  sight  glass).  When  facing  this  end  the 

inlet check valve

 is  on  the 

left

 

(

A

)

 

and the 

outlet check valve

 is on the 

right

 

(

B

)

The discharge should be piped directly to the storage tank that is to receive the waste liquid. 
The discharge may be teed into an existing flow line, provided that a check valve is installed 
to prevent high pressure from returning to the discharge check valve on the JATCO tank. 

The tank supply gas must have adequate 

volume

 and pressure. For best operation use 1” pipe 

for  the  tank  supply  gas  plumed  as  close  to  the  tank  as  possible.  Then  reduce  down  to  the 

tubing connections 

(C) 

and 

(

J

)

 on the JATCO tank. 

Supply  gas  pressure

 

is  connected  to  the  inlet  of  the  level  control  valve  (

C

)  this 

gas pressure  must  meet  70  PSI  and  not  exceed  75  PSI.  A  separate  supply  gas  pressure 

is connected  to  the  3-way  ball  valve

  (

J

)  this 

gas  pressure  must  not  exceed  200  PSI

 

for  normal  operation.  No  pressure  regulator  is  provided  as  most  applications  for  this 

device  have pre-regulated gas pressure supplied.

Depressing  the  manual  dump  plunger  (

F

)  allows  the  operator  to  check  function  of  the  float 

control  valve  actuator.  When  the  plunger  is  depressed,  the  tank  will  cycle  once  and  return 

to the automatic operation when the plunger released. The plunger button should be returned 

to the extended position. 

Listed below are a series of steps to follow if the JATCO tank fails to dump properly. 

Be  sure  there  is  an  adequate  supply  of  gas  pressure  (

70-75  psi

),  to  the  inlet  connection  at 

the  level  control  valve.  If  there  is  enough  pressure  at  the  inlet  connection,  press  down 

manual  dump  plunger  (

F

)  to  empty  tank,  then  vent  when  the  cycle  is  complete.  If  the 

JATCO  tank fails  to  dump  manually,  remove  connector  tubing  to  actuator  (

G

)  to  test  for 

pilot  pressure  from  level  control  valve  (

D

).  If  level  control  valve  is  not  sending  pressure 

to the  actuator  (

G

) when  depressing  manual  dump  plunger  (

F

),  removal  and  or  inspection 

of  level  control  valve  will  be  necessary.  If  pressure  is  present  but  actuator  fails  to 

operate, remove  inspect  and  or replacement may be necessary. 

244 N.W. 111

th

St.   • 

  Oklahoma City, Oklahoma 73114    • 

405/755-4100  •  405/755-4101 Fax

 

Reviews: