background image

smart slider
LD350 / LD700

05/2022

997-00220-EN

Operating
instructions

Summary of Contents for LD350

Page 1: ...smart slider LD350 LD700 05 2022 997 00220 EN Operating instructions...

Page 2: ...intenance and care Maintenance intervals Faults Decommissioning Disassembly Disposal Maintenance report Commissioning declaration Legal notice Contents Index Title page 2 Keller minimal windows 997 00...

Page 3: ...00 properly and have it checked at least once a year by a qualified company and have this recorded in writing Visually inspect the smart slider thoroughly at least 1x per month for damage proper funct...

Page 4: ...no one is in the danger zone and immediately release the button in case of abnormal situations To open Give an open command via the control button and hold it down until the sliding part is fully ope...

Page 5: ...and stop about 25 cm before the end From here you have to give again an open command via the control button at this time keep the button pressed until the sliding part is fully open The system stops i...

Page 6: ...IS FREE OF OBSTACLES AND OR PERSONS AND THIS DURING THE ENTIRE RUN PERIOD In the event of a power failure or a defect in the drive and the window is closed and you want to open it you can disengage t...

Page 7: ...ves and clothing as well as safety shoes when servicing the system Make sure that you can always perform your work stably Secure the installation maintenance area with a safety tape so that third part...

Page 8: ...ed by a recognized installer or company Maintenance can be divided into two levels Maintenance level 1 User level maintenance WHEN with normal use 1 x per month WHO maintenance that can possibly be ca...

Page 9: ...mbly still runs smoothly Keep the slide course free of dirt Check whether the flight bar is still nicely and centered between the brushes Check the operation of the automation by checking whether the...

Page 10: ...ice Disconnect the installation from the electrical mains and ensure that it remains disconnected during maintenance work Bearings guides and moving parts must be lubricated with oil SAE 20 quality Ch...

Page 11: ...d technician Broken control unit Call an qualified technician Sliding part runs not smoothly Obstacle detected See if running way is completely free of obstacles and dirt Mechanical issue Call an qual...

Page 12: ...r Remove the top cover Unscrew the carrier bracket Disassemble the beam completely Pay attention sufficient support so that the beam does not fall when unscrewed Carefully lower the motor bar and remo...

Page 13: ...of construction Commissioning on Manufacturer AB Matic nv Duifhuisstraat 37 3800 Sint Truiden Belgium 2 Customer 3 Installer 4 Sliding unit to be operated Type Dimension Weight 5 Control 6 Working mod...

Page 14: ...ription of works Signature Signature installation start up adjustments safety checks repairs technician customer Always note works that have been carried out in writing Fill in the maintenance sheet a...

Page 15: ...Movement is running smoothly Safety devices are in good shape and condition Start Stop function No defects found Adjustments Installation check up Performance tests Checking the assembly Absence of ab...

Page 16: ...reproduction of common names trade names product descriptions etc in this work does not justify the assumption that such names are to be considered free in the sense of trademark and brand protection...

Page 17: ...05 2022 Keller Minimal Windows S A 38 40 Route de Wilwerdange L 9911 Troisvierges www minimal windows com...

Reviews: