25/02/2021
Ver. 1
1
24/08/2017
Installation Instructions Horizon Three Sided
Natural Draft Electronic Ignition
Gas Fireplaces
Page 1: ...25 02 2021 Ver 1 1 24 08 2017 Ver 1 1 Installation Instructions Horizon Three Sided Natural Draft Electronic Ignition Gas Fireplaces...
Page 2: ...use 6 10 9 5 in AS NZS5601 1 2013 one or more ventilation openings with a combined free ventilation area of not less than the equivalent cross section area of the flue cowl shall be provided for each...
Page 3: ...ter It is the responsibility of the gas fitter to follow the regulations set out in the Gas Code that dictate the procedures to follow when installing a gas appliance particularly regarding gas pipe s...
Page 4: ...Ventilation size can be altered depending on the appliances Mj usage Vs the total room size the appliance is situated m3 this will be determined by a licensed gas fitter NOTE The chimney in which the...
Page 5: ...LASS ONE SIDE IS OPTIONAL CEMENT SHEETING UNDER Z DETAIL Z USE EYELETS TO SUPPORT OPEN END TO FRAME ABOVE THREE SIDED A B C D E E1 F G H I 1100 LOW LINE 1274 480 870 435 10 12 450 135 10 15 1500 LOW L...
Page 6: ...480 870 435 10 12 450 135 10 15 1500 LOW LINE 1670 490 1000 565 12 14 435 60 10 15 NOT INCLUDING 10MM FIBRE CEMENT SHEETING 285mm USE EYELETS TO SUPPORT OPEN END TO FRAME ABOVE SECTION VIEW Z Z Y Z Z...
Page 7: ...to the eyelets the turn buckle can then be simply wound up to take the tension Tighten the turn buckle until both the top and bottom glass runners are parallel Removable glass panel can now be placed...
Page 8: ...ONE ACTIVE FLUE CASING STANDARD VENT HOLES FULL WELD HEAT ZONE CONVERSION IMPORTANT VENTILATION INTO CHASE FROM VENT 240MM X 90MM SUPPLIED CEILING WITH 25MM AIR SPACE TO OUTER FLUE IMPORTANT BOTH CAPS...
Page 9: ...ACE 10MM COMPRESSED FIBRE CEMENT SHEET BETWEEN UNIT AND BOTTOM SUPPORT FRAMING FRAMEWORK AND 10MM WALL LINING BY INSTALLER 150MM MIN 110MM MIN CEILING CEILING WITH 25MM AIR SPACE TO OUTER FLUE REQUIRE...
Page 10: ...S1 Optional Heat zone ON OFF Switch S2 General Purpose Outlet GPO 2 x10 amp GPO S IMPORTANT IF HEATZONE KIT IS USED UNUSED OUTLET MUST REMAIN UNCAPPED CEILING SW 1 SW 2 Installation Instructions Keml...
Page 11: ...2 x 3 1 4 x 3 0 90 2 4 700 Cantilever HCLC P L700 NAT GAS LPG 700 Mk2 Pebble 55 39 3 5 1 85 1 00 2 35 700 Mk2 Coal 55 39 3 5 1 85 1 00 2 35 700 Ironbark Log Mk4 55 39 3 5 1 85 1 00 2 35 1100 Cantilev...
Page 12: ...ng off wall switch System does not have a high low burner switch Laying the fire Coal Pebble Evenly spread a bag of Vermiculite into the burner tray Tray should be completely filled to the top with Ve...
Page 13: ...LES 1000 992 X 135 MARK 2 COALS 1400 1400 X 64 MARK 2 PEBBLES 1400 1400 X 64 MARK 2 COALS 1800 1800 X 64 MARK 2 PEBBLES 1800 1800 X 64 MARK 2 COALS 1000 992 X 135 MARK 2 PEBBLES 700 800 600 X 155 Inst...
Page 14: ...large log has two holes on the underside to position in place 1 L O C AT E 4 C E R A M I C C OA L S Four ceramic coals are supplied with the burner base These coals must be laid in the position indica...
Page 15: ...een 3 LOCATE LOG NO S 2 3 Two front log no s 2 and 3 are supplied to fit into the space between the metal frame and the ceramic base These logs do not cover the front burner ports but are designed to...
Page 16: ...ght hand side of the burner with the right hand side of the logs positioned between the metal uprights of the grate Two pins are provided to firmly position these two logs onto the large rear log no 1...
Page 17: ...uld assistance be required contact nearest agent E The gas burner is designed to work in a Kemlan Horizon electronic power flue ignition system Working correctly there will be no spillage Unit should...
Page 18: ...ice information contact Kemlan Australia Head Office 13 French Avenue Brendale Queensland 4500 Telephone PH 07 3490 5500 TAIS 00 L140 D5 000V Installation Instructions Kemlan Three Sided Natural Draft...
Page 19: ...CHECK FAN ON INDEPENDENT POWER SWITCH FAN COMES ON PILOT ON MAIN BURNER DOES NOT LIGHT 1 FLAME SENSOR NOT SENDING SIGNAL TO OPEN VALVE CHECK ELECTRODE IS IN PILOT FLAME CLEAN ELECTRODE CHECK ELECTROD...
Page 20: ...BURNER SENDING SIGNAL TO OPEN VALVE FLAME CHECK ELECTRODE CONNETCTIONS CLEAN ELECTRODE CHECK ELECTRODE FOR DAMAGE REPLACE ELECRODE 2 MODULE NOT SENDING REPLACE MODULE SIGNAL TO OPEN VALVE 3 FAULTY VAL...
Page 21: ...If a fault occurs the sequence of the flashing red light indicates the fault These codes are listed below The green light indicated the ignition box is sensing the flame Fan Forced Models The codes ab...
Page 22: ...essure switch fault you can blow on the input to the switch and you should be able to hear it switch If you have a multi meter you can check if the switch is opening and closing as pressure is applied...
Page 23: ...inted finish of the heater 2 4 Damage caused by water ingress 2 5 Cost of removal of defective heater or re installation of replacement heater 2 6 Failure to use fireplace components supplied by Kemla...