This unit should be fitted by a qualified electrician in accordance with the appropriate
national/IEE wiring regulations. Switch off mains supply before installation and maintenance.
This product must not be modified. Any modification will negate any Safety Mark Approvals and
may render the product unsafe. GreenBrook accepts no responsibility for modified products.
This product must be installed in accordance with these instructions. This fitting should not be
installed in close proximity to any external source of heat or covered with any heat insulating
material, air flow around the fitting should not be restricted. Note any minimum distances to
adjacent surfaces. This unit should be connected to the lighting supply circuit, or fused at a
maximum of
5
A.
This unit is a non-maintained (NM suffix), self-contained emergency luminaire.
To confirm model type, check the data provided on the fitting and packaging.
ELTSLED
65
NM
Non-maintained:
Incorporates two
54
LED lamps which are
illuminated only under mains failure conditions
SAFETY
GENERAL DESCRIPTION
INSTALLATION INSTRUCTIONS
EMERGENCY LUMINAIRE TEST RECORD SHEET
LUMINAIRE TYPE/REF:_________________________________
DATE OF INSTALLATION:_______________________________
LOCATION:________________________
Is
s
u
e
n
o
:
7
0
3
7
4
9
PLEASE KEEP THESE INSTRUCTIONS SAFE FOR FUTURE REFERENCE
Month
Test
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
THREE HOUR
1
st Year
2
nd year
3
rd year
4
th year
5
th year
1
2
3
4
5
6
7
8
9
10
11
12
Signed
Signed
Signed
Signed
Signed
Date
Date
Date
Date
Date
Installation / Operating
Instructions for ELTSLED
65
NM
WEST ROAD . HARLOW
ESSEX . CM
20 2
BG . UK
s a l e s @ g r e e n b r o o k . c o . u k
W W W . G R E E N B R O O K . C O . U K
Follow these instructions carefully to ensure safe and reliable operation. Retain this leaflet for
future reference. The emergency luminaire should be connected to a stable and permanent
mains supply of the correct rated voltage and frequency as stated on the product specification
label. This may be from the lighting supply circuit, or fused at a maximum of
5
A. To facilitate
testing a fused spur box can be included in the unswitched permanent live supply.
Class I. This product must be earthed.
All switching etc, shall comply with BS
5266
Part
1.
Unless specifically permitted, emergency
luminaires should not be connected or controlled by any energy management device.
Before commencing installation, ensure that the electricity supply is disconnected. Surge
suppressors may be required at the point of connection to the supply wiring when installing
luminaires to MICC cable.
1
. Undo the four cover retaining screws and remove the front cover.
2
. Select and remove a knock out corresponding with the conduit and / or cable run and secure
a suitable bush within the hole to prevent damage to the incoming cable.
3
. Mount the case in position on a suitable surface ensuring an adequate airflow will be
maintained around it, or secure to wall using the four hole dimensions on the back case.
Routine Inspection & Test Procedure
All tests should be undertaken during daylight hours at times of minimum risk and be in accordance with
the recommendations of BS
5266
Part
1
:
2005
.
DAILY -
Check that the three green LED battery charging / lamp failure indicators are illuminated.
MONTHLY -
In addition to the daily check, a functional test through simulation of mains supply failure
should be carried out to confirm lamps are illuminated from the battery cell pack supply. This test need only
be approximately
30
seconds. It should not exceed one quarter of the rated
luminaire duration.
SIX - MONTHLY -
In addition to the monthly test, the lamps should be illuminated from the battery cell
pack supply for a continuous period of at least one hour.
THREE - YEARS -
In addition to the monthly tests the lamps should be illuminated from the battery cell
pack supply for the full rated duration of the luminaire. (
180
minutes).
ANNUALLY THEREAFTER -
As above, i.e, Check that the luminaire operates for the full rated duration (
180
minutes).
At the end of each test period the mains supply should be restored and a check made to ensure that all
three green LED battery charging/lamp failure indicators are illuminated.