REACH
INSTALLATION INSTRUCTIONS
VANITY TOP
K-18571T, K-18572T
-1-
, 2009
Copyright Kohler China Ltd., 2009
·
·
·
Observe all local plumbing and building codes.
Prior to installation, unpack the new lavatory and inspect it
for damage. Return the lavatory to its protective carton
until you are ready to install it.
All information in these instructions are based the latest
product information available at the time of publication.
Kohler China reserves the right to make changes in
product characteristics, packaging, or availability at any
time without notice.
Make sure that the wall and floor are square
and plumb to ensure proper installation.
IMPORTANT:
·
·
·
ORDERING INFORMATION
REACH Vanity Top 105 .....................................K-18571T
REACH Vanity Top 70 .......................................K-18572T
105 ............................................K-18571T
70 ..............................................K-18572T
REQUIRED MATERIALS/
(NOT SUPPLIED)
TOOLS
·
·
·
·
·
·
·
Level
Drill with
bit
6mm
14mm wrench
Framing square
Channel lock pliers
Tape measure
Pencil
·
·
·
·
·
·
·
6mm
14mm
528137
ROUGHING-IN DIMENSIONS
ROUGHING-IN DIMENSIONS
UNIT: mm
:
K-18571T
45
35
70
235
65
150
1055
770
70
235
135
350
500
415
1119169-T01-A