1. Cut the
strapping and lift
the box top and put
it to the side to be
used as a remote
work station.
2. Use the box top
as a work station to
lay out all of the
components.
Open up the main
hardware bag so
that you can clearly
see all the
numbered
hardware bags.
NOTE: Hardware
bag "STEP 6" is
intentionally
not
included. This
hardware comes
preinstalled from
the factory.
3. Remove upright
and place it on top
of the big white
foam packaging
cube.
4. Remove the
rest of the
components and
place them on the
box top or near by.
Remove the base
frame from the
pallet and place it
in the exact spot
you plan to use it.
Tip: Keep the cross brace foam
tubes on until you install upright
to avoid accidental scratching.
ASSEMBLY INSTRUCTIONS