background image

 

Lang Manufacturing Company 

6500 Merrill Creek Parkway 

Everett, WA  98203 

 

Phone: 425-349-2400   Fax: 425-349-2733 

 

WWW.LANGWORLD.COM 

© Copyright 2000 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Installation, Operation, Maintenance, & Troubleshooting 

Model:  CLB-2-S  

Electric Cruise Line Double Broiler 

Serial:  

 

 

 

Summary of Contents for CLB-2-S

Page 1: ...any 6500 Merrill Creek Parkway Everett WA 98203 Phone 425 349 2400 Fax 425 349 2733 WWW LANGWORLD COM Copyright 2000 Installation Operation Maintenance Troubleshooting Model CLB 2 S Electric Cruise Line Double Broiler Serial ...

Page 2: ...RNING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE INJURY OR DEATH READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT NOTICE THIS EQUIPMENT IS APPROVED FOR INSTALLATION ONLY ON VESSELS GREATER THAN 65 FEET IN LENGTH IN ACCORDANCE WITH USCG REGULATIONS IN TITLE 46 CFR 110 113 ANY WIRIN...

Page 3: ...ER PAGE 1 TABLE OF CONTENTS 3 2 READ FIRST 4 3 UNPACKING 6 4 INSTALLATION 7 5 INITIAL START UP 8 6 OPERATION 8 7 CLEANING MAINTENANCE PROCEDURES 9 8 TROUBLESHOOTING 10 9 PARTS LISTS 11 10 EXPLODED VIEW 12 11 WIRING DIAGRAMS 17 ...

Page 4: ... DONE BY PERSONNEL QUALIFIED TO WORK WITH ELECTRICITY IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND OR DAMAGE TO EQUIPMENT UNIT MUST BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES NOTICE The data plate is located behind the access cover to the right of the unit The broiler voltage wattage serial number wire size and clearance specifications are on the data plate This information sh...

Page 5: ...n this or any other LANG appliance must be performed by qualified personnel only Consult your authorized service station directory or call the factory at 1 800 224 LANG 5264 or WWW LANGWORLD COM for the service station nearest you WARNING BOTH HIGH AND LOW VOLTAGES ARE PRESENT INSIDE THIS APPLIANCE WHEN THE UNIT IS PLUGGED WIRED INTO A LIVE RECEPTACLE BEFORE REPLACING ANY PARTS DISCONNECT THE UNIT...

Page 6: ... carefully Improper use of tools can result in damage to the equipment Remove and discard plastic wrap Remove and discard desiccant bags placed inside broiler cavity The broiler rack frame and rack are secured for shipping purposes and for safety and should remain secured until unit is at its final location Legs where applicable are packed inside broiler cavity or cabinet base and should remain th...

Page 7: ...ation should be carefully read and understood before proceeding with the installation NOTICE The installation of any components such as a vent hood grease extractors fire extinguisher systems must conform to their applicable National State and locally recognized installation standards 4 1 Electrical Connection Electrical connection must be made behind the control compartment in the cabinet base Th...

Page 8: ...or the first couple of hours of use this is normal OPERATION CAUTION ALWAYS KEEP THE AREA NEAR THE APPLIANCE FREE FROM COMBUSTIBLE MATERIALS CAUTION KEEP FLOOR IN FRONT OF EQUIPMENT CLEAN AND DRY IF SPILLS OCCUR CLEAN IMMEDIATELY TO AVOID THE DANGER OF SLIPS OR FALLS 6 1 Broiler Controls The controls are located on the right side of the unit There are two switches One on top and one on bottom The ...

Page 9: ...ROTECTIVE CLOTHING CAREFULLY READ THE WARNING AND FOLLOW THE DIRECTIONS ON THE LABEL OF THE CLEANER TO BE USED Empty crumb tray daily or when 1 3 full It is easily removed for washing Clean exterior of the broiler with hot water and a mild detergent to maintain a gleaming appearance 7 2 Daily Cleaning The broiler should be thoroughly cleaned at least once a week in addition to the normal daily cle...

Page 10: ...rectory or call the factory at 1 800 224 LANG 5264 or WWW LANGWORLD COM for the service station nearest you WARNING BOTH HIGH AND LOW VOLTAGES ARE PRESENT INSIDE THIS APPLIANCE WHEN THE UNIT IS PLUGGED WIRED INTO A LIVE RECEPTACLE BEFORE REPLACING ANY PARTS DISCONNECT THE UNIT FROM THE ELECTRIC POWER SUPPLY If an item on the list is followed by an asterisk the work should be done by a factory auth...

Page 11: ...at Shield CLB 427 4 16 Large 2 Pole Terminal Block 30500 11 2 17 Nut Hex Stainless Steel 10 24 20303 08 64 18 Washer Stainless Steel 5 16 S A E Flat 20203 06 64 19 Screw Stainless Steel 1 4 20 x 1 1 4 Hex Head 20111 25 12 20 Bearing Washer CLB 310 12 21 Broiler Bearing 70202 03 12 22 Bearing Bracket CLB 401 12 23 Nut Hex Acorn 1 4 20 Stainless Steel 20301 29 8 24 Carriage Assembly CLB 002 2 25 Hea...

Page 12: ...12 ...

Page 13: ...13 ...

Page 14: ...14 ...

Page 15: ...15 ...

Page 16: ...16 ...

Page 17: ...17 WIRING DIAGRAM ...

Reviews: