background image

LONE STAR AVIATION CORP.

  •

604 S. WISTERIA

 •

  MANSFIELD, TEXAS 76063

  •

1-682-518-8882  or 1-682-518-8831- FAX

INSTRUCTION SHEET

CONGRATULATIONS ON THE PURCHASE OF YOUR NEW DOCKING STATION FOR THE
WULFSBURG C-5000 COMMUNICATIONS CONTROL HEAD.

STEP 1   UNPACKING:

UNPACK YOUR DOCKING STATION FROM THE SHIPPING CONTAINER, CHECK FOR ANY
DAMAGE.  IF THE CONTAINER AND PRODUCT HAS BEEN DAMAGED CONTACT LONE STAR's
CUSTOMER SERVICE REPRESENTATIVE TO REPORT THE INCIDENT.

A. THE ENCLOSED PACKAGE WILL CONTAIN THE FOLLOWING ITEMS:

1  ( ONE EACH )  C-5000 DOCKING STATION.
2. ( ONE EACH )  AC CORD.
3. THE APPROPRIATE CABLE ASSEMBLY ( ONE EACH, C-5000 ).
4. PANEL FUSE.

STEP 2   READ INSTRUCTIONS:

READ THIS INSTRUCTION SHEET THOROUGHLY,  IF YOU HAVE ANY QUESTIONS PLEASE CALL
YOUR LONE STAR AVIATION CUSTOMER SERVICE REPRESENTATIVE FOR CLARIFICATION.

STEP 3   SETUP:

SETUP THE DOCKING STATION ON A LEVEL DESK TOP OR BENCH NEAR A GROUNDED AC POWER
OUTLET SOURCE.

STEP 4   INSTALLING THE C-5000 INTO THE CONTROL STATION :

THE DOCKING STATION COMES READY TO OPERATE, SIMPLY LOOSEN THE (4) SCREWS ON
THE LEFT & RIGHT SIDE OF THE TOP COVER SO THAT YOU CAN SLIDE THE CONTROL HEAD
INTO THE OPENING UNTIL THE CHASSIS’s FRONT BEZEL IS ALMOST INSERTED.

NEXT ALIGN THE (4) DZUS FITTINGS (MALE) ON THE CONTROL HEAD TO THE (FEMALE)
RECEPTACLES ON THE CONTROL STATION’s TOP RACK.  YOU CAN LOOSEN OR TIGHTEN
THE  SIDE  SCREWS  (4)  TO  THE  FRONT  DZUS  MOUNTING  SYSTEM  AS  REQUIRED  FOR  FINAL
ADJUSTMENT.

YOU SHOULDN'T HAVE TO MAKE ANY MAJOR ADJUSTMENTS ONCE THE UNIT IS POSITIONED
IN PLACE.  SOME USERS KEEP THE FRONT SCREWS LOOSER THAN THE REAR.  THIS WILL MAKE
IT EASIER AND QUICKER TO INSERT AND REMOVE THE CONTROL HEAD FROM THE DOCKING
STATION WHEN YOU USE IT.

CONGRATULATIONS:

REVISION 7-15-05  PRINTED IN USA

Wulfsburg C-5000

LSPE -00236

Reviews: