background image

P.O. BOX 3448 • OMAHA, NEBRASKA 68103-0448 • (800) 228-9882

I-5

of 20

0-3F 

REV. AL 

5954 

6/2007 

Lozier® Corporation 2007

1.

Snap chalkline on floor for desired locations 

of all island runs.

Snap 

  Chalkline 

     Here

2.

Lay out parts along chalkline as shown. At this point you will need one Back Panel for the first section of each 

island run. Splicer Rails (for two-piece Backs) and Top Rails will be used in later steps.  Determine what style 

of Base Bracket will be used and refer to step 3a or 3b to install.

3’ or 4’

Base

Fronts

Base

Brackets

Uprites

Base

Brackets

Chalkline

Center Rails

Bottom Rails

Base Fronts

Island Section Installation

Please read each step carefully!

Refer to Component Breakdown on page I-1 before starting.

Reviews: