background image

83

Installation and User manual:

Model

Installation and User

’s

 manual PB - GB

Subject to technical changes

 FaceFix installation to a window frame / wall [F1]

Do not damage the product when using a sharp knife to open 

the packaging! Fitting screws: Use a size-2 screwdriver (PO-

ZIDRIVE) or use an electric screwdriver at it’s lowest torque. 

5DLOUHPRYDO8VHDÀDWVFUHZGULYHURIPD[PPZLGH2QO\

use the original screws enclosed, to prevent malfunctioning 

from using too thick screw heads!

B

C

A

A

B

X=5 cm

x

x

max. 70 cm

x

x

max. 70 cm

2 3 3 3 1 

10 

3

0 - 80 cm

3 4 4 4 1 

14 

4

81 - 115 cm

3 5 5 5 1 

16 

5

116 - 150 cm

4 6 6 6 1 

20 

6

151 - 185 cm

4 7 7 7 1 

22 

7

186 - 220 cm

5 8 8 8 1 

26 

8

221 - 230 cm

A

B

C

 Removal

 5

 Connection

 3

 Tensioning/slackening the steel wire

 1

 FaceFix installation

 2

 Fitting the lower covers

 4

 Installation sequence

4-A1

4-A2

4-B1

4-B2

 Rail installation sequence on Clips

The built-in motor (24 V DC) with automatic end position 
adjustment may only be connected to the 230V mains 
using a stabilized 24 Volt DC Power Supply.

 

Only use Power Supplies and controls recommended 

by the manufacturer of the Pleated Blind, to prevent 

damage or malfunctioning caused by non-compatible 

electric components!

 

When connecting electric compo-

nents, the wiring diagram provided by the manufacturer of 
the Power Supply must be observed.

Note: if necessary, before clicking the rail 
into place, slacken the steel wire

Push 

¿

rmly to the right

left to tension

slacken 

the steel wire

 Number of parts

 Product width

21-03-2014

2106/56

[F1]

Reviews: