background image

Summary of Contents for FLAT 6

Page 1: ......

Page 2: ...Cable Clamps _____ N18 2 5 16 Eye Bolts w 2 NO1 each _____ C02 2 1 2 Metal Hose Clamps _____ PL1 2 3 8 Plastic Caps Black _____ PL2 10 437 Plastic Caps Black _____ PL5 1 2 Plastic Cap Black _____ PL5...

Page 3: ...MATCH SEE FIG 4 1 st DIRECTOR 2nd DIRECTOR J 16 6 A 3rd DIRECTOR 16 6 A PLSR RED PLASTIC CAF 4th DIRECTOR 16 2 A NOTES OR DETAILS OF BOOM GUY ASSEMBLY AND MAST MOUNTING SEE FIG 2 AFOR DETAILS OF ELEM...

Page 4: ...he outside hex nuts only a couple of turns onto the ends of the eyebolts and leave the inside nuts loose so that you can take the slack out of the cable later Now take two 2 foot lengths and attach an...

Page 5: ...nly preliminary Change to get equal sides of 9 4 3 4 Fiberglass length is not critical however the equal wire length of 9 4 3 4 is very critical 7 Take the remaining reflector wire and thread it throu...

Page 6: ...O U P L E R I I VO3P V E R T I C A L G U Y S U P P P P O R T 1 I EGl INSULATOR I I I I I I I I I I I I O O M W I T H B O O M T O i I M A S T P L A T E A T T A C H I i I I I I I I I I I I I 1 I I I I...

Page 7: ...SADDLE 5 16 NUTS t W A S H E R S u I VERTICAL E L E M E N T I I l5 16 NUTS W A S H E R S I I HORIZON I AL ELEMENT MOUNTING ELEMENT SPACING I I VERTICAL ELEMENT MOUNTING FIGURE 38 _ _ _ _ _ _ _ _ _ _ _...

Page 8: ...D GO BACK TO THE CAPACITOR HORIZONTAL SLIDER ADJUST 23 VERTICAL SLIDER ADJUST 17 LK WSHR SQ NUT HORIZONTAL DRIVEN I I ELEMENT r ZO2P ZO8P GAMMA STRAPS INSTALL FLUSH AGAINST BOOM TO ELEMENT MOUNT I 3 8...

Page 9: ...a c t y o u r l o c a l i n s t a l l e r i f c o n s u l t a t i o n o r a s s i s t a n c e i s r e q u i r e d A l l t o w e r a n d a n t e n n a i n s t a l l a t i o n s s h o u l d b e t h o r...

Reviews: