background image

01COR0707-V1

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

7x7 Corner Shed

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the highest 

standards of Safety and in the case of childrens products 

independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this 

product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) 

Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

Refer to the instructions pages for you specific product code

Summary of Contents for 01COR0707-V1

Page 1: ...must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we can...

Page 2: ...ect your building MADE IN GREAT BRITAIN Door Panel Window Panel Plain Panel Rear Panel Right Rear Panel Left Floor Roof Sheet Door QTY 2 Roof Support Bar 2650mm Roof Support Bar 1303mm Roof Support Bar 763mm Roof Support Block 210mm QTY 3 Door Block 140mm QTY 2 Eaves Frame 2049mm Eaves Frame 2025mm Eaves Frame 1149mm Qty 2 Eaves Frame 1196mm Fascia 2045mm QTY 2 Fascia 1202mm QTY 2 Fascia 1213mm Co...

Page 3: ... Step 4 Place the plain window panel onto the floor Secure the plain panel and the window panel to the rear panels using 3x50mm screws The window and plain panels can be placed either side of the building Do NOT screw the building to the floor until the roof is fitted 6x50mm Screws Pre drill hole 50mm screw 1 8 8 26 Step 5 Secure the doors to the door panel using 2x T hinges per door fixing into p...

Page 4: ...lack Screw 30mm screw 30mm screw Pre drill hole 12 9 Step 8 Place the door panel onto the floor Secure the panel to the the window plain panel using 6x50mm screws Do NOT screw the building to the floor until the roof is fitted 6x50mm Screws 50mm screw Pre drill hole Roof support must be level with top of framing Step 9 Position the larger roof support bar in the centre of the building between the ...

Page 5: ...nsure the framing is flush to the edge of the sheet and fix into each eaves frame into place using 30mm screws 17x30mm Screws 30mm screw Pre drill hole Step 12 Place the assembled roof section onto the building esuring the framing slots over each side Secure into place using 21x40mm screws making sure to align the screws with the vertical framing and along the roof support bar It is recommended to...

Page 6: ...ound the building see dotted line 80x Felt Tacks Felt tacks HANDLE WITH CARE 1 2 3 4 Step 15 Fix the cover trims to the building using 3x30mm screws per trim 12x30mm screws 30mm screw Pre drill hole Step 16 Fix the cover trims to the building using 3x30mm screws per trim 6x30mm screws 30mm screw Pre drill hole P 6 Please retain product label and instructions for future reference 22 22 22 22 1 2 3 ...

Page 7: ...17x40mm screws 40mm screw Pre drill hole It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference ...

Reviews: