All building’s should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instruction pages for your specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinate and alcohols: 2, 4, 6-trichlorophenol.

Summary of Contents for 01GRODB1008-V3

Page 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Page 2: ...x16 16mm Screws x14 Pre Assembly Remove transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 P 2 01GRODB1008 V3 Overall Dimens...

Page 3: ...r panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 15 14 14 Step 3 Fix the door strips onto the front gable using 4x30mm screws for...

Page 4: ...and instructions for future reference Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window pan...

Page 5: ...a tongue and groove fixing 8x50mm Screws 8 8 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Page 6: ...e lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per r...

Page 7: ...a boards to the front and rear of the building using 3x40mm screws per fascia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards...

Page 8: ...ernal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the locking mechanism...