background image

P 1

03BUT0606-V1 

Buttermere 6x6 Octagonal Summerhouse

 

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Summary of Contents for 03BUT0606-V1

Page 1: ...ather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as...

Page 2: ...Y x4 Roof Panel AI 03BUT0606 V1R QTY x8 Floor AI 03BUT0606 V1F 8 9 10 11 12 13 14 15 16 17 19 20 21 18 PI 07 0011 QTY 16 Window Block PI 04 0062 Roof Plate PI 04 0023 Finial F60106 106mm OCTAGONAL BOSS Roof Boss PI 04 0002 Door Stop PI 07 0069 Roof Metal Plate PI 07 0002 QTY 3 Hinge MBP 121mm ANGLED CUT Roof Panel Point x8 Buttermere roof trim 4318 1107mm Roof Trim 1107mm x8 F4444 1100mm BIRDMOUTH...

Page 3: ...e Window first 48x30mm screws Pre drill hole 30mm screw Step 2 To fix the Door No 4 into the Door panel No 2 Lay the Door panel flat on the ground and place the Door within the doorway The door can be hung from either side to suit your needs It is important that the door is placed central in the space provided Fix the Hinges No 20 to the Door panel No 2 using 4x30mm black screws t21x30mm screws Pr...

Page 4: ...l and the first 2 Window panels No 3 together using 3x60mm screws as shown Erecting the panels in this manor allows for them to be spaced evenly Do not secure the building to the Floor until the Roof is fitted 9x60mm screws Pre drill hole 60mm screw 3 Panel top Panel bottom 1 1 Plain panels are interchangeable with the Window panels Door panel Step 6 The remaining panels can be also be fixed into ...

Page 5: ...0mm screws per rafter 8x40mm screws Once all rafters are attached secure the with 1x60mm screw 8x60mm screws Pre drill hole 40mm screw 50mm screw 60mm screw 18 15 9 Step 8 From the outside of the building place the roof frame into position making sure that the Roof rafters are each equally spaced between two panels shown Step 9 Secure the Roof framing to the building with 2x40mm screws per Roof ra...

Page 6: ...king sure they are evenly spaced When placed secure each panel from the inside with 6x40mm screws as shown Do not secure the building to the Floor until the Roof is fitted 48x40mm screws Pre drill hole 40mm screw 100m m 1 0 0 m m 5 5 5 5 5 5 5 5 Step 10 Place the Roof Panel No 5 onto the rolled out lengths of felt and cut to allow for accurately sized felt Make sure the cut felt is at least 50mm l...

Page 7: ...s The felt will only cover half of the fascia Do not secure the building to the Floor until the Roof is fitted 180 xFelt Tacks Felt tacks Step 15 Secure each Roof trim No 8 as shown with 3x30mm screws Do not secure the building to the Floor until the Roof is fitted 24x30mm screws Pre drill hole 30mm screw 8 Step 13 Measure and cut to length 8 even pieces of Fascia No 10 to the building place at th...

Page 8: ...th 4x30mm screws making sure to screw into framing 32x30mm screws Pre drill hole 30mm screw Pre drill hole 30mm screw Step 18 Fix the building to the floor with 50mm screws evenly spaced and screwed into the Floor bearers 32x50mm screws Pre drill hole 50mm screw Step 17 Measure and cut to length 8 even pieces of Fascia No 10 to the building place at the top of each panel making sure they contact t...

Page 9: ...ack of the door with 4x30mm screws Making sure to align the key holes On the inside of the door opening fix the ply triangle door stop No 16 to the bottom left corner using 3x20mm screws 11x20mm Screws Pre drill hole 20mm screw AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL that you apply wood treatment immediately after the building has be...

Reviews: