background image

P 1

Please retain product label and instructions for future reference

             

General Instructions

03DTSHHP1206HGD4MW-V1 & 03DTMBHP1206RFP 

12x6 Clover Summerhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or 

extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment 

to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  

The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap 

the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding 

ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for your specific product code

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Summary of Contents for 03DTMBHP1206RFP

Page 1: ...oisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as...

Page 2: ...996mm QTY 1 S1240 996mm Roof Bearer A 44x58x2211mm QTY 1 F4458 G 2251mm 2x32 CUTS 26 8 19 27 28 10 11 Eaves Frame 28x28x1805mm QTY 6 FS2828 1805mm 20 Building Content Roof Bearer B 44x58x528mm QTY 5 F...

Page 3: ...g 5x30mm screws 5 x 30mm Screws Pre drill hole 30mm screw 21 21 24 24 SIDE VIEW 21 24 Step 2 Parts needed No 4 QTY 2 No 6 QTY 1 No 21 QTY 1 No 24 QTY 1 Lay all of the required parts on to a flat level...

Page 4: ...nt Window Panel No 4 with 3x30mm screws per hinge Then fix the T hinges No 36 to the door with 3x30mm screws per hinge Repeat the process for the Master Door No 12 36 x 30mm Screws 36 36 Pre drill hol...

Page 5: ...e drill hole 50mm screw 11 11 11 11 1 1 1 1 Step 6 Parts needed No 3 QTY 2 No 5 QTY 2 Fix the Side Window Panel No 3 and the Plain Panel No 5 togeth er by screwing through the fram ing using 5x50mm sc...

Page 6: ...his is to be fitted to the opposite side 3 5 2 5 Step 8 Parts needed No 2 QTY 1 No 3 QTY 1 No 5 QTY 2 Place the two Plain Panels No 5 that were assembled with the Side Window Panel No 3 and the Back P...

Page 7: ...Pre drill hole 50mm screw 4 4 5 5 Step 12 Parts needed No 4 QTY 2 Place the already assembled Door Panel No 4 6 12 13 22 25 into position and fix together with the two front plain panels No 5 3x50mm s...

Page 8: ...de whilst you construct the roof 1600x200mm QTY 4 HANDLE WITH CARE 1 2 3 4 100mm gap between each panel 50mm overhang below each panel 50mm overhang below each panel 50mm overhang below each panel 260...

Page 9: ...these panels have not been assembled yet please refer to step 13 Repeat this step for both sets of assembled roof panels No 8 9 10 8 10 9 Step 18 Parts needed No 14 QTY 1 No 16 QTY 5 Fix the Roof Bloc...

Page 10: ...2 No 8 QTY 1 No 9 QTY 1 No 10 QTY 1 No 14 QTY 2 No 16 QTY 5 The use of a step ladder is essential to construct the roof To construct the Roof place the previously assembled in Step 19 6ft Roof Panel N...

Page 11: ...the framing of the roof panels and that the pointed corners meet the line that was drawn in a Step 16 The underside of the roof should look as shown 10x60mm Screws Pre drill hole 60mm screw 15 15 15...

Page 12: ...e screws go into the framing behind 24x40mm Screws Pre drill hole 40mm screw 22 22 22 22 22 22 Step 26 Fix the roofs to the panels below by screwing down through the roofs into the panel framing below...

Page 13: ...felt using felt tacks with even spaces of 100mm between each tack 300x Felt tacks C B A A B C 1 2 3 4 34 Step 29 Parts needed No 19 QTY 4 No 20 QTY 2 Secure the Fascias No 19 20 to the building using...

Page 14: ...g 5x30mm screws 5x30mm Screws Pre drill hole 20 33 33 20 33 33 30mm screw Step 32 Parts needed No 26 QTY 12 Fix the Cover Trims No 26 to each corner and over each join of the buiding with 3x30mm screw...

Page 15: ...er hinge Repeat this step for both window sides of the building 20x20mm Screws Pre drill hole 20mm screw 31 35 31 Step 35 Parts needed No 29 QTY 1 No 30 QTY 2 On the internal of the doors fix the Towe...

Page 16: ...that the edges are flush with the framing Fix with 4x30mm screws per strip 12x30mm Screws Pre drill hole 30mm screw 28 28 27 27 27 Step 38 Parts needed No 37 QTY 2 On the outside of the building fix t...

Page 17: ...ng 1x10mm screw at each meeting point as shown in the diagram 24x20mm screws 8x10mm screws0mm screw20mm screw Pre drill hole 10mm screw 20mm screw 18 18 17 18 18 18 18 18 18 17 17 17 Please retain pro...

Page 18: ...2 1 3 4...

Page 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: