background image

1

2

3

4

5

6

10

11

28

We strongly recommend pre drilling 

holes before fixing screws.

50mm Screw x36 

40mm Screw x100 

Felt Tacks x185

30mm Screw x125

60mm Screw x50

30mm Black Screw x2

7

8

9

27

80mm Screw x6

03HEL1008DDFW-V2

For domestic and family use only
Retain Instructions for future reference
             

Dimensions

Length = 2416mm
Width = 2436mm
Height = 2124mm 

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

This building should be erected by 

two people.

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are delivered pre-treated with a water based timber treatment 

however this only helps to protect during transit of your garden item. To 

validate your guarantee and for better protection against weathering it is 

ESSENTIAL that you treat the garden building with a wood preserver within 3 

months of assembly. This will need to be re-applied annually to ensure longevity 

of your building. Care must be taken when constructing the garden building 

that it is not touching the ground and is on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and 

annual treatment.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  The base should be slightly 

smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended 

that the floor be at least 25mm above the surrounding ground level to avoid flooding.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we 
cannot accept responsibility for your safety whilst erecting or using this product.

Before 

  assembly  make sure you 

have a suitable base 

ready to erect your 

building 

 

2x Front Fascia 1650mm

Door panel

Window

Gable R

Window

Gable L

Plain Side

QTY 2

Back Roof

Left

Back Roof

Right

Back

Floor

QTY 2

Slave

Door

Master

Door

4x Bottom Roof Trim 1455mm

12

4x Top Roof Trim 1510mm

13

2x Cover Trim 1783mm

14

2x Cover Trim 2059mm

15

Roof Support 2830mm QTY 3

16

2x Roof End 2960mm

17

Door Bar 1705mm

18

2x Door Beading 1711mm

Finial

23

Turn Button

QTY 2

22

Flush Hinge

QTY 6

Key Plate

21

20

Door Handle

QTY 2

24

Mortice Lock

25

Barrel Bolt

QTY 2

26

Felt

Nail Bag

x4 Rain Guard 580mm 

19

Roof Block

QTY 6 

Lrg Rain Guard - 1472mm

29

Summary of Contents for 03HEL1008DDFW-V2

Page 1: ...guarantee and for better protection against weathering it is ESSENTIAL that you treat the garden building with a wood preserver within 3 months of assembly This will need to be re applied annually to...

Page 2: ...t Fix with 16x50mm screws alternate the fixing positions along the length of the floors Step 1 Floor Assembly Pre Assembly b Join the flush hinges to the door frames using 30mm screws Ensure hinges ar...

Page 3: ...crews as shown in the diagram Step 2 Continued 17 18 18 Fit the door beading strips to the inside of the door frame using 8x30mm screws ensuring that they sit flush with the frame and the door Attach...

Page 4: ...8x40mm screws Repeat this process with the second roof panel a 15 28 15 Step 6 Place the first ridge bar inside the building and line up with the upright framing on each gable Align the back edge of...

Page 5: ...ich strips on top and underneath the roof each side using 24x30mm screws Step 10 60mm screw Pre drill hole 36x60mm screws Secure the building to the floor using 36x60mm screws in alignment with the fl...

Page 6: ...n buttons to the top and bottom of the slave door using 2x30mm black screws These turn buttons help to keep your doors straight during high and low levels of moisture content in the air Step 14 Step 1...

Page 7: ...the framing above door 14x50mm Screws Hint Silicone seal the back of the rain guard to help reduce water running behind 29 S I L I C O N E S E A L A N T It is ESSENTIAL that you apply wood treatment i...

Reviews: