background image

P 1

04GREENLEAN0804-V1

8x4 Lean-to Greenhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Summary of Contents for 04GREENLEAN0804-V1

Page 1: ...conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss...

Page 2: ...scia 12x60x1387mm QTY 2 S1260 1387mm Angled Door Strip 12x27x1750mm S1227 1750mm Ridge Bar 27x44x2247mm F2744 2247mm Door Frame 27x44x2094mm F2744 2114mm Angled Door Window Frame 27x44x556mm QTY 2 F27...

Page 3: ...quare and layed onto a firm and level surface that has suitable drainage and is free from areas where standing water can collect 4x70mm screws Step 3 Door Gable Assembly Following the same method outl...

Page 4: ...le onto the building using 7x50mm screws 7x50mm screws Pre drill hole 50mm screw 11 Step 6 Fix the door strip No 11 onto the door frame No 13 using 3x30mm screws as shown in the illustration Ensure th...

Page 5: ...strips No 9 to the top of the roof No 8 using 20mm screws making sure that the strip overhangs the roof by 12mm as shown in the illustration 10x20mm screws Pre drill hole 20mm screw 4 18 Step 11 Plac...

Page 6: ...secure the roof to the building using 18x40mm screws Ensure to screw through the roof into the framing below 18x40mm screws Pre drill hole 40mm screw 20 a 20 c 20 b Step 15 Rest the door No 5 into th...

Page 7: ...TMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference 10 10 Step 16 Attach the fascia s No 10 to the top of t...

Reviews: