**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

05DTMBAX0307DD-V1

DIP TREATED MATCHBOARD APEX 3X7 DOUBLE DOOR BIKE STORAGE

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

P 1

Please retain product label and instructions for future reference

             

General Instructions

Summary of Contents for 05DTMBAX0307DD-V1

Page 1: ...placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately t...

Page 2: ...X1327 V1 5 Door Qty 2 AI S11FBMBZBD781X1320 V1 4 Floor Qty 2 AI R11MBF795X988 V1 3 Roof Qty 2 AI S11MBOHAR1110X825 V1 7 Bolt Block 28x28x132mm Qty 4 FS2828 132mm 8 Fascia 12x56x1095mm Qty 4 s1256 1095mm 9 Ridge Bar 28x28x744mm Qty 1 FS2828 744mm 10 Cover Trim 12x45x1324mm Qty 4 S1245 1324mm 14 Felt PI 01 0025 15 Pad Bolt Qty 1 PI 07 0035 17 Turn Button Qty 2 PI 07 0034 12 Corner Brace Qty 2 PI 07 ...

Page 3: ...mm screws per hinge 28 x 30mm Screws Step 1 1 5 13 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws Parts Needed No 4 Qty 2 Place the floors No 4 on a firm and level base ensure the base has suitable drainage free from areas where water can collect see front page for base requirements Position the floors side by side as shown in the diagram Fix together using 4 x 50mm screws alte...

Page 4: ...n line with the central framing of the gable tops No 1 2 Fix in place with one Corner Brace No 12 at each end using 4x30mm screws per brace 8 x 30mm Screws Pre drill hole 50mm screw 9 12 A Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 3 Qty 2 Attach the roof No 3 using 7 x 30mm screws on each side Secure the roofs No 3 into place using 7 x 30mm screws ensure the roof sits square ...

Page 5: ...m screws as shown Pre drill to avoid splitting Attach the finial No 16 to the fascias at the front and the back of the building using 2 x 30mm screws per finial 16 x 30mm Screws IMPORTANT Pre drill before fixing screws 30mm screw Pre drill hole 16 16 8 8 8 8 10 10 10 Step 10 IMPORTANT Pre drill before fixing screws 30mm screw Pre drill hole Parts Needed No 10 Qty 1 Fit the Cover Trims No 10 to the...

Page 6: ...utton 2 x 30mm Screws 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws 17 17 17 Step 13 Parts Needed No 11 Qty 2 Locate the Door strips No 11 onto the door gable and fix into place using 3x30mm screws Ensure that the screw is parallel with the door frame when fixing as shown in the close up view 6 x 30mm Screws Pre drill hole IMPORTANT Pre drill before fixing screws 11 30mm screw...

Page 7: ...label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back ...

Page 8: ...P 8 2 1 3 4 ...

Page 9: ...P 9 1 2 ...

Reviews: