background image

P 1

03WES1208-V3 

Wessex 12x8 Summerhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for up to 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufacturers recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Pressure Treated Timber

Pressure treating is a chemical process which helps to protect wood against adverse weather which could 

lead to rot or insect damage.

The most common chemicals used to pressure treat wood are 

Alkaline Copper Quaternary

 (

ACQ

), 

Copper Azole

 (

CA

), and 

Micronized Copper Quaternary

 (

MCQ

).

Safety: 

Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in 

pressure treated wood, never burn its sawdust or scraps; instead dispose in a landfill.

Summary of Contents for Wessex 03WES1208-V3

Page 1: ...ed but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pr...

Page 2: ...x2 2 1 3 4 5 6 7 8 Window AI 03FW540X1132 V1 x2 Rail AI 03WESRAIL V3 x2 Master Door AI 03MDFG1720X475 V1 Slave Door AI 03FG1720X475 V1 9 10 11 12 Fascia 1365mm S1295 1385mm angled x4 Window Cross A 50...

Page 3: ...Panels together with 3x50mm screws as shown Do not fix to the Floor until the Roof is fitted 3x50mm screws Pre drill hole 50mm screw Step 3 Fix the Window panel No 8 into position with 3x50mm Plain p...

Page 4: ...fix to the Floor until the Roof is fitted 6x50mm screws Pre drill hole 50mm screw Step 6 Place the Veranda No 4 at the front of the building Do not fix to the Floor until the Roof is fitted 7 8 4 1 2...

Page 5: ...aps of the gable framing Make sure the Roof is flush to the rear of the building and secure with 6x50mm screws as shown Do not fix to the Floor until the Roof is fitted 10x30mm screws Pre drill hole 2...

Page 6: ...the Floor with 4x50mm screws per panel 16x50mm screws Pre drill hole 50mm screw 15 15 15 15 5 3 14 Step 14 Fix the Gable Trims No 16 to the build ing with 2x30mm screws per Trim Fix the Cover Strips...

Page 7: ...hown in the diagram Making sure there is 50mm of overhang Fix to the buildings using evenly spaced felt tacks 140xFelt tacks Felt tacks Step 15 Fix the Rails No 9 to the building as shown with 3x40mm...

Page 8: ...first Door Gable windows come secured within the panel 24x30mm screws Pre drill hole 30mm screw Step 19 Fix 3 Hinges No 23 to each Door No 10 No 11 securing with 4x30mm black screws per hinge Position...

Page 9: ...ews Pre drill hole 20mm screw Step 24 Fix the Turn Buttons No 24 to the top of each door with 1x20mm black screw per Button 2x20mm black screws Pre drill hole 30mm screw 22 22 24 21 Step 23 Fix the Pr...

Page 10: ...point 12x20mm screws 6x10mm screws Pre drill hole 10mm screw 18 17 17 20mm screw Please retain product label and instructions for future reference P 10 AFTER TREATMENT score around protective cover o...

Reviews: