background image

PARTS & SERVICE for BT-1 Mini Conveyor Bagel

Toaster

The BT-1 Mini-Conveyor Bagel Toaster is engineered
for efficient, dependable service throughout the years.
Like any piece of fine equipment with moving parts and
broad temperature ranges, physical wear takes its toll.
When this happens, the information found in this manual
will prove very helpful.  Although the instructions are
easy to follow, all repair procedures should be carried out
by a qualified 

Merco/Savory Certified Service Repre-

sentative.

The savory BT-1 compact bagel toaster brings the
advantages of conveyor style toasting to your lower
volume needs.  The BT-1 is designed to toast the product
on the 

top side only

.  The heater control knob and the

conveyor speed knob enable the operator to adjust to the
desired toasting requirements.  The BT-1 can produce up
to 425 bagel halves per hour. (Depending on moisture
and sugar content of product as well as color preference.)

The BT-1 Bagel Toaster is available in

120 volt, single phase, AC only.

1200-JDM                                                                                                                                                                         07153

Summary of Contents for BT-1

Page 1: ...ocedures should be carried out by a qualified Merco Savory Certified Service Repre sentative The savory BT 1 compact bagel toaster brings the advantages of conveyor style toasting to your lower volume needs The BT 1 is designed to toast the product on the top side only The heater control knob and the conveyor speed knob enable the operator to adjust to the desired toasting requirements The BT 1 ca...

Page 2: ...k of the unit Remove this screw and slide out the panel When replacing either panel be sure that the panel is properly positioned in the securing track 2 The top cover is also held in place with one sheet metal screw Remove this screw and slide the top cover towards the back of the toaster When replacing the top cover be sure that it is properly positioned in the securing tracks 3 The bottom cover...

Page 3: ...nal ends Refer to the wiring diagram E Fan Fan Housing Fan Motor Figure 2 1 Remove the bottom cover 2 Rotate Fan Blades which will expose 2 nuts securing the fan housing to the motor Remove these two nuts to remove the housing 3 To remove the fan motor but do NOT remove the 2 motor mounting bracket nuts slide the motor until clearance is achieved 4 Cut the wire harness ties to gain access to the w...

Page 4: ...on I Conveyor Shaft Sprocket Figure 3 5 6 1 Remove right side panel Section A 2 Remove drive chain Section H 3 Loosen set screw on hub of sprocket and slide sprocket off shaft 4 When installing new sprocket make sure set screw rests in hole of shaft 5 Replace drive chain Section H J Conveyor Belt Figure 3 4 7 1 Remove right and left side panels Section A 2 Loosen but do NOT remove the bearing reta...

Page 5: ... Element As sembly Figure 3 4 8 9 10 1 Remove right and left side panels Remove top cover and chimney Section A 2 Remove the 6 sheet metal screws 3 on each side securing the assembly to toaster sides 3 Disconnect the 2 wires at heating element terminal ends 4 Carefully lift out assembly 5 Reverse this procedure to install new assembly Refer to wiring diagram M Individual Heating Element Figure 3 4...

Page 6: ...6 ...

Page 7: ...7 ...

Page 8: ...8 1111 N Hadley Rd Fort Wayne In 46804 Tel 800 701 2992 Fax 260 436 0735 www mercosavory com ...

Reviews: