background image

3d Installation Guide 

for ULN-8/LIO-8

3d Installation Guide

for ULN-2

Summary of Contents for ULN-2 3D

Page 1: ...Mobile I O User s Guide 3d Installation Guide for ULN 8 LIO 8 3d Installation Guide for ULN 2 ...

Page 2: ...ULN 2 3d Upgrade Installation Guide Metric Halo Revision 1532 Publication date 2017 08 12 12 42 12 0400 Fri 08 Dec 2017 Copyright 2017 Metric Halo ...

Page 3: ...3 Table of Contents 1 ULN 2 3d Upgrade Installation Guide 5 Introduction 5 Required Tools 5 Installation Kit Components 7 Installation 10 ...

Page 4: ... 17 Remove Front Panel 11 1 18 Detach Ribbon Cable 12 1 19 ADAT Opto Board and Ribbon Cable 12 1 20 Screws and Nuts to Remove from Back Panel 13 1 21 Remove Back Panel 13 1 22 Remove 2d Board 14 1 23 Remove Legacy Master Board 14 1 24 3d Assembly Installed 15 1 25 Bridge Board Installed 16 1 26 Reattach Meter Board 16 1 27 Front Panel Meter Board Assembly Replaced 17 1 28 New Back Panel Placement ...

Page 5: ...nvironment with minimal static to avoid the potential for electrostatic discharge Please familiarize yourself with the parts and instructions before proceeding with installation Required Tools You will need the following tools to do the installation 2 Phillips Head Screwdriver Figure 1 1 2 Phillips Head Screwdriver Flat Head Screwdriver Figure 1 2 Flat Head Screwdriver 7 64 Hex Wrench included wit...

Page 6: ...on Guide 6 Needlenose Pliers Figure 1 4 Needlenose Pliers Optional Power Screwdriver Figure 1 5 Optional Power Screwdriver If you choose to use a power screwdriver set it to the lowest drive setting possible when replacing screws ...

Page 7: ... The ULN 2 3d Upgrade Installation kit includes the following parts 3d Upgrade Board Set Figure 1 6 3d Base Board with Pre installed CPU Module MH Clock Board Rubber Feet on the bottom New Back Panel Figure 1 7 ULN 2 3d Back Panel Bridge Board Figure 1 8 Bridge Board ...

Page 8: ... 9 Foam Cap for Bridge Board One 1 new side panel extrusion with grooves for accommodating EdgeCards Figure 1 10 Side Panel Extrusion NOTE The side panel extrusions on your interface may already have the proper configuration Optional EdgeCard Figure 1 11 AES SPDIF EdgeCard ...

Page 9: ...ons before opening your interface Be sure to discharge any static energy on your body before touching the interior of the interface Each individual upgrade kit has components that are uniquely serialized Please upgrade one unit at a time Make sure that the serial number on 3d card matches the serial number on your back panel Figure 1 13 3d Upgrade Kit Matching Labels ...

Page 10: ...3 With needlenose pliers loosen the ring nut around the headphone jack and twist it off 4 Pull off the 6 front panel knobs If they do not come off easily by hand gently coax a flat head screw driver behind the knob as you pull it forward then slowly pry the knob off Figure 1 14 Remove Knobs 5 With needlenose pliers loosen and twist off the 6 hex nuts that sit behind the rubber knobs Figure 1 15 Re...

Page 11: ...e remaining one aside together with the new extrusion 8 With 7 64 hex wrench remove the remaining screws that hold the top cover panel these are the four smaller hex screws across the top front of the unit and the two on the top back of the unit 9 Remove and set aside the top panel Figure 1 16 Remove Top 10 Remove the remaining screws that hold the front panel these are the four hex screws on the ...

Page 12: ... meter board assembly aside Figure 1 18 Detach Ribbon Cable 13 With 7 64 hex wrench remove the remaining two hex screws on the bottom of the back panel and one more hex screw in between the two ADAT ports 14 Detach the ADAT opto board and ribbon cable from the 2d board and set aside Figure 1 19 ADAT Opto Board and Ribbon Cable ...

Page 13: ... Figure 1 20 Screws and Nuts to Remove from Back Panel 17 Remove the four screws around the analog input jacks 18 Remove the two screws around the 4 pin XLR power connector 19 Remove the five screws around the SPDIF and AES connectors these five screws will not be needed later 20 Slide off the old back panel Tilt it up from the bottom to lift over the XLR release tabs Figure 1 21 Remove Back Panel...

Page 14: ... out as a cluster Rock the 2d board back and forth to loosen it from the pins on the analog board pulling upward The master board may begin to pop off of the metal posts on the bottom metal Place a hand underneath the master board to pop it off the remaining posts Set the Legacy Master board and 2d card aside Figure 1 22 Remove 2d Board Figure 1 23 Remove Legacy Master Board ...

Page 15: ... analog board As you down the 3d assembly tilt it so that the side that abuts the analog board goes in first and clears this tab Press into place so the base board snaps down on all three posts If there are rubber feet present on the bottom metal that were supporting the original master board peel them off if they get in the way of the rubber feet under the 3d base board Figure 1 24 3d Assembly In...

Page 16: ...dge board Once lined up firmly press down Figure 1 25 Bridge Board Installed IMPORTANT The orientation and alignment of the bridge board is critical The lip must be facing toward the back of the unit The bridge board needs to line up exactly without any bent or misaligned pins 24 Reattach the ribbon cable from the meter board to the matching set of pins on the 3d board toward the front of the unit...

Page 17: ...hex screws on the bottom Figure 1 27 Front Panel Meter Board Assembly Replaced 26 Attach the new back panel first looping it over the XLR release tabs Replace the two small hex screws on the bottom Make sure the MH Link Ethernet stack is flush with its window on the back panel Figure 1 28 New Back Panel Placement ...

Page 18: ...Guide 18 27 Attach the ADAT opto board ribbon cable to the matching pins behind the ADAT back panel windows Figure 1 29 ADAT Opto Board Reconnected 28 Replace small hex screw between the ADAT ports Figure 1 30 ADAT Opto Board Bolted ...

Page 19: ...pin XLR power connector With a Phillips screwdriver replace four threaded Phillips head screws around the analog input con nectors Replace the 8 ring nuts These may be tightened slightly with needlenose pliers Figure 1 32 Screws and Nuts to Replace on New Back Panel 32 On the front panel posts replace the 6 hex nuts that will sit behind the rubber knobs These may be tightened slightly with needlen...

Page 20: ...se the longer case screws here as they would damage the front panel meter board 35 Orient the side panel extrusions so that the holes for the rack ears are facing the front of the unit For the side of the unit that the EdgeCard slot is on the thicker grooved interior portion of the extrusion must be toward the top and the narrower interior portion on the bottom Figure 1 34 Side Panel Orientation 3...

Page 21: ...into the Edge bus slot on the 3d card so the EdgeCard inserts into its slot Turn the two retention screws to tighten it in place The EdgeCard metal should be flush to the back panel metal Figure 1 35 Installing the EdgeCard The installation is finished If you have any questions about the installation process contact support mhsecure com with the subject 3d Field Upgrade ...

Reviews: