background image

 Assembly of 8x8 

Thank you and congratulations on the purchase of your 

 garden building. 

We believe that this product will give you many years of excellent service. This 
is a natural product manufactured to a high standard therefore if you have any 
queries  or  experience  any  difficulties  then  please  contact  our  customer  service 
hotline 

 

 

  

Preparation of base 

We recommend that the base onto which your building will stand should be at least 
75mm larger in each direction than the total floor size of the building. 
Actual floor area of the building (not including verandah): 2390x2390 (8’x8’) 
Total height clearance: 2096mm 
The chosen position in your garden for the siting of the building should be  
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs 
can be evenly laid - 

THEY MUST BE LEVEL AND FIRM.

 

Treatment/care of your Garden Building 

Treat with a suitable decorative wood finish immediately. We recommend that all 
timber pieces be treated again prior to assembly and again within 3 months of  
assembly. We further recommend that all pieces are treated again at least annually 
or as frequently as the instructions on the product used recommends. 
We would suggest that all wall panels be treated in an upside-down position to 
allow the finish/treatment to ingress into the tongue and groove jointing. 
We would also remind you that you would rarely (if ever) be able to re-treat the 
underside of the floor following assembly. We strongly recommend that the        
underside of the floor is treated an absolute minimum of twice (not including pre-
treatment). 

Garden buildings are not waterproof, therefore on assembling building we 
recommend using a silicon based sealant between wall panels and between 
wall panels and floor. 

 

Hammer

 

Step ladder

 

Sand paper

 

Battery-powered drill/screwdriver

 

8mm drill

 

Pencil

 

Tape measure

 

Gloves

 

Sharp knife and saw

         

IMPORTANT! 

PLEASE READ PRIOR TO ASSEMBLY OF 
THE BUILDING 

EVERY PRECAUTION IS TAKEN TO 
ENSURE THAT YOUR BUILDING HAS NO 
ELEMENT INCORRECTLY PLACED OR 
POSSIBLY HAZARDOUS, HOWEVER 
PRIOR TO USE PLEASE CHECK ALL 
SURFACES FOR THE FOLLOWING: 
1 RAISED GRAIN, SPLINTERS: sand 
down timber to smooth finish 
2 NAIL/SCREW/PIN HEADS PROUD: tap
home to be flush with surface of timber 
3 DAMAGED SCREW HEADS 
RESULTING IN SHARP SPLINTERS OF 
METAL: replace 
4 SHARP ENDS OF NAILS/ SCREWS/ 
PINS PROTRUDING THROUGH THE 
PANEL: remove and reposition. 
5 ENSURE ALL PARTS ARE SECURED 
AGAINST REASONABLE FORCE: 
remove and refit 
6 ENSURE THERE ARE NO LOOSE 
PARTS: remove and refit/discard 

We recommend that protective 
gloves be worn throughout

 

Wood is a natural product and is therefore 
prone to changes in appearance, including 
some warping, movement and splitting, 
particularly during unusual climatic conditions 
(long hot or wet spells of weather). As a natural 
occurrence this is not covered by a guarantee. 

     

PLEASE NOTE

 

18/
12/
08 

    

TOOLS REQUIRED 

QTY    DESCRIPTION 

6      Door glazing 544x373 
6      Window glazing 360x373 
13      Beading 553mm 
13      Beading 363mm 
25  
4   
4  

  Beading 377mm   

Plain fascia 1

420

   

Cover strip

 

1

84

0

2      Diamonds 
1      Gate latch set 
36      60mm screws 
10      25mm black screws 
32      40mm nails 
160    Felt nails 
96     15mm panel pins 
1      Felt roll 10mtr x 1mtr 

VERANDAH (IF ORDERED)

   

2     Balustrade rails 
4     ‘L’ shaped brackets 
4     60mm screws 
8     25mm screws 
3     Felt roll 4mtr x 1mtr 

1

831~

1

831

2390

FRONT PANEL

BACK PANEL

2390

2320

1834

WINDOW SIDE PANEL

2320

PLAIN SIDE PANEL

1

834

1195

2390

FLOOR PANEL QTY 2

(IF ORDERED)

VERANDAH FLOOR

2390

900

2760

1312

ROOF PANEL QTY 2

3390

1312

VERANDAH ROOF QTY 2 (IF ORDERED)

Parts List 

EXTERNAL VIEW  
OF PANELS 

Reviews: