background image

7”, 10.1” and 15.6” Tablet and 10.1” Vue 

Wall Box Installation Manual

MWB-7-MCT/MWB-10-MCT/MWB-156-MCT/MWB-10-VUE

Specifically designed to fit  
our products seamlessly.

Summary of Contents for MWB-7-MCT

Page 1: ...7 10 1 and 15 6 Tablet and 10 1 Vue Wall Box Installation Manual MWB 7 MCT MWB 10 MCT MWB 156 MCT MWB 10 VUE Specifically designed to fit our products seamlessly ...

Page 2: ...ox B 4 Mounting Plate E 2 Screws F 2 Screws D 2 Drywall Clips C 2 Front Bezel Parts List y t Q n o i t p i r c s e D A x o b l l a w n i B Tablet Display Mounting Plate C Front Bezel D Dry Wall Clips Installed E Dry Wall Clip Screws Installed F M4 x 6mm Screws 1 1 1 4 4 8 Tools ...

Page 3: ...the enclosure before you cut the drywall so you do not expose a stud by accident Once you have located the studs on the left and right of where you are going to install the enclosure cut the necessary hole in the drywall where you want the enclosure installed Use the chart below to determine the size of the hole needed for the enclosure you are installing A B Insert wall box into hole in drywallwi...

Page 4: ...drywall clips D by tightening the drywall clip screw E just enough to secure the box to the wall do not over tighten yet While holding the box in place repeat this for the opposite top clip then the two bottom clips Once the box is level tighten all four drywall screws E so that the enclosure is tightly held in place ...

Page 5: ...dapter plate B using four M4 screws F provided and the Vesa 75 holes in the back of the display 1 8 Mount the adapter plate B using four M4 screws F provided to the wall box 1 9 Install the bezel B by aligning and pressing in place ...

Reviews: