background image

Molok Oy    Nosturikatu 16    37150 Nokia, Finland    Tel. +358 10 3429 400   molok@molok.com   www.molok.com

DEEP C

OLLECTION

®

9/

20

16

/M

TJ © M

o

lo

k O

y

MolokDomino® Plus installation instruction

   

1.

 Dig a 500 mm installation pit for MolokDomino® Plus. Width of the pit should be 2400 mm. Carefully level the 

bottom with 0/16mm crushed gravel, check the straightness with spirit lever/ line laser and compact the ground 
carefully.

2.

 Fix the plastic bottom anchors into the container

with two bolts each (bolts are tightened max. 25 Nm).

3.

 Lift the container to the installation pit by using lifting

loops. Note to remove the lifting loops after the installation.

When installing the containers into a group, leave 40 mm distance 
between the tops of the wells and attach the adjacent containers 
with an upper rail (u-profile). The rail is drilled through the support 
frame

 

and fastened from 8 points with pop rivets, see image 1.

4.  

Fill the pit as described in the image 2 - note to change the 

soil types accordingly. Fill evenly on both sides of the containers 
to keep the container straight. With a light plate compactor, 
compact the filling soil carefully with every 200 mm layer. 
We recommend to use max. 100 kg round compactor. 
Expanded clay ( e.g. Leca®) is used between the containers near 
ground level. 

Make sure that the finishing layer slopes slightly downward 
from the container.

5.

 In group installations, finish the framings by fastening 

extension pieces for framing (A+B) with pop rivets, see image 
3. First fasten the lower horizontal support profile (B)
in line with the framing element. Place the vertical
extension piece (A) on correct place between the
two framing elements and fasten the upper horizontal
support profile (B). Finish the framing by fastening
the vertical extension piece (A) to the horizontal support
profiles (B). Make sure the vertical extension piece is installed
straight.

6. 

Lift and open the lifting bag carefully and check that the 

bottom of the lifting bag is closed tightly and the rope is 
placed according to the instructions. It is possible for the 
lifting bag’s closing mechanism to open during delivery.

7. 

Place the lids, lifting bags and quick systems on their place.

If the lid is not fastened to the quick system; fasten the lid with 
M8 x 35 torx screws. There are 3 screws per lid. Cover plate is 
used on the hole of the lifting handle: fasten the cover plate 
with screws.

A
B
C

Image 2. 

Filling the pit

A

 - Finishing layer, 100 mm

- Gravel 0/32, 400 mm

C

 - Crushed gravel 0/16, min. 50 mm

B

A

 

B

Image 3. Finishing the framing

Image 1. 

Fastening the upper rail

Reviews: